Current house: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
== Basement Remodel == | == Basement Remodel == | ||
<hovergallery> | <hovergallery> | ||
Image:IMG_5868. | Image:IMG_5868.jpg | ||
Image: | Image: | ||
</hovergallery> | </hovergallery> | ||
Line 18: | Line 18: | ||
Image: | Image: | ||
</hovergallery> | </hovergallery> | ||
== Data Center == | |||
See [[Camp_Kiwi_Data_Center|Camp Kiwi Data Center]]. | |||
== Pre-Purchase Pictures == | == Pre-Purchase Pictures == |
Revision as of 17:11, 30 June 2019
We purchased our new home after Christmas 2017 and started an ambitious remodel, completely gutting the basement to add a second master space and create a Data Center. We also elected to covert it to 100% geothermal heating and air-conditioning and install tankless hot water (to supplement the "free" geothermal hot water). geothermal is dedicated to the geothermal installation process and results.
Addition
Basement Remodel
Geothermal Installation