Current house: Difference between revisions
No edit summary |
No edit summary |
||
(335 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
We purchased our new home after Christmas 2017 and started an ambitious remodel, completely gutting the basement to add a second master space and create a [[Camp_Kiwi_Data_Center|Data Center]]. We also elected to covert it to 100% [https://en.wikipedia.org/wiki/Geothermal_heating geothermal] heating and air-conditioning and install tankless hot water (to supplement the "free" geothermal hot water). [[This page| | __NOTITLE__ | ||
We purchased our new home after Christmas 2017 (closing was 12/27/2017) and started an ambitious remodel, completely gutting the basement to add a second master space and create a [[Camp_Kiwi_Data_Center|Data Center]]. The basement remodel got it's Final inspection on 04/28/2020 (we moved down from upstairs in November of 2019). The addition received it's Final inspection for occupancy on 01/26/2023, though we were using it well before that. We also elected to covert it to 100% [https://en.wikipedia.org/wiki/Geothermal_heating geothermal] heating and air-conditioning and install tankless hot water (to supplement the "free" geothermal hot water). [[This page|Geothermal]] is dedicated to the geothermal installation process and results. | |||
== Pictures to Process == | |||
Just uploading these for now, I need to add the background later. | |||
<hovergallery> | |||
Image:x.jpg|x | |||
</hovergallery> | |||
== Driveway == | |||
The house came with a decent asphalt driveway back in 2017. We tore it up building the addition and burying the geothermal wells and piping under it, as well as just running construction equipment over it for 3 years. And, I seriously dislike it. Concrete is King. Long live the King. Anyway, we're preparing to install the new driveway, with a largish parking area, an electric rolling gate with mail drop and package drop and camera/entry keypad and lights. It should be pretty pimp, though it is going to be terribly expensive... <br> | |||
Update: April 2023, construction actually started, pictures below. It will be 5" thick with rebar, and the parking pad (4 or so cars) next to the addition, which will have in-slab heating for melting snow that I'll plow here from the courtyard (with sub-surface drainage). The plan is also to have an electrically-operated car gate in front of the courtyard, so we're adding a truck turnaround and large mail/package delivery and dispensing unit for the letter-carrier and UPS/FedEx. There will be a video doorbell at the gate so we can let people in, and car detector to open the gate to let folks out, as well as car detectors on either side of the driveway to notify us when someone is coming down the driveway. "All the modern conveniences" as they say. The honeysuckle on both sides of the drive is being removed, as well as the landscaping between us and the neighbor's driveways, but we will probably put something back at the end. Also, our southern neighbor has a fence and light post on our property, in the driveway easement, that isn't mentioned in that easement, so we're going to remove that. Some of that is controversial, so we've retained counsel just in case it gets bothersome.<br/> | |||
Here is a picture of the southern property line. As you can see, we actually own the land under about 1/2 of their driveway. Their easement on our plot allows them to "access their property, and maintain the current driveway". It is silent on any other feature, which means we retain all other rights. Incidentally, we had to point out this nuance at a Village planning meeting on x as they are also making improvements. They're building a new 3 car garage as well, and a sun room on the opposite end of their house, and had planned a expanded driveway on our property. We shared our survey to indicate that this was, in fact, our property, and that code does not allow building closer than 5' of the property line. During their construction, they've placed their potta-potty and ruble pile on our property (in the easement) at the same time as our ruble is on the opposite easement, so I'm sure that our northern neighbor is not enjoying the view these days.<br> | |||
The concrete guys cut the water supply to the fountain and the sprinklers, so we need to reconnect this. We had them bury conduit to house these, and mark them where they exit the new slab. You can we went with rebar rather than chicken wire, and this is held off the ground with plastic "chairs", and is drilled-through the end boards to keep it centered in the slab. They're pouring large - about 30' x 30' sections, at a time and then saw-cutting as they move forward. They also found the incoming fiber for our internet and cut it. The ISP was out the next day to string a new line overhead, and we'll bury a conduit under the driveway at the low-point trench drain so they can run from the pole, under the drive, and around the house to the ONT. The fountain circle is now centered on the house, leaving just under 30' clearance on both sides, but is not quite centered on the front door (it's off center) or either garage (our doors are 10', whereas the old garage has 9' doors - which makes our new garage slightly longer as well).<br> | |||
=== Finishing === | |||
<hovergallery> | |||
Image:2023_05_23 Driveway Full 1.jpg | |||
Image:2023_05_23 Driveway Full 2.jpg | |||
Image:2023_05_23 Parking 1.jpg | |||
Image:2023_05_23 Parking 2.jpg | |||
</hovergallery> | |||
=== Easements, Plans, and Survey === | |||
<hovergallery> | |||
Image:driveway plan.jpg|Survey (STAMPED) | |||
Image:property line south.jpg|Sourthern property line surveyed and staked, you can seen the middle fence post is essentially in-line with the property line, so the fence segment north of this will be removed, along with the lamp post | |||
Image:935 Sandra Dirt Pile.jpg|Their construction debris pile | |||
Image:935 Sandra runoff.jpg|Runoff from their dirt pile | |||
Image:00Driveway-Driveway.jpg|Basic driveway plan | |||
Image:00Driveway-Driveway-2.jpg|Driveway plan | |||
Image:2023_04 driveway plans 1.jpg|highlighting the buried conduit for utilities | |||
Image:925 easement.jpg|Southern Easement | |||
Image:935 easement.jpg|Northern Easement | |||
File:925 easement U_010933_01560.pdf|925 Easement | |||
File:925_Congress_Easment.pdf|925 Easement | |||
File:935 easement U_011136_00951.pdf|935 Easement (Trelawny) | |||
</hovergallery> | |||
=== Courtyard === | |||
<hovergallery> | |||
Image:2023_04 driveway 1.jpg|Gravel delivery | |||
Image:2023_04 driveway 2.jpg|Cars stacked up in driveway - a real donneybrook | |||
Image:drain repair and tie in.jpg|The fountain needs to drain to the roof drain connection - and they cracked it... | |||
Image:2023_04 Sprinkler 2.jpg|This is where the sprinkler conduit exits the slab | |||
Image:2023_04 Sprinkler 1.jpg|Here you can see the corner of my office window where the connection to the house is | |||
Image:2023_04 driveway 3.jpg|Getting ready for the first pour | |||
Image:2023_04 fountain 1.jpg|Preping for the fountain curb | |||
Image:2023_04 fountain 2.jpg|Forms for the curb around the fountain, note that a conduit for electric (lights and fountain power) and plumbing (hose bib to fill the fountain and to run out front to the sprinklers) have been installed | |||
Image:2023_04 fountain 3.jpg|Poured - note the nice rounded/rolled edges and finish work | |||
Image:2023_04 fountain 4.jpg|Fountain curb curing | |||
Image:2023_04 Fountain Electric 1.jpg|This is where conduit for the electric exits the slab | |||
Image:2023_04 Fountain Electric 2.jpg|Note the grey conduit | |||
Image:2023_04 new garage 1.jpg|Grading in front of the addition | |||
Image:2023_04 new garage 2.jpg|Grading | |||
Image:2023_04 new garage 3.jpg|Adding rebar, will be 5" concrete and we don't want it move or crack | |||
Image:2023_04 new garage 4.jpg|Overview of the nearly-ready to pour "new side" | |||
Image:2023_04 new garage 5.jpg | |||
Image:2023_04 new garage 6.jpg | |||
Image:2023_04 old garage 1.jpg|The 'old' driveway and some parking access as we widen the driveway, although with all the work and traffic it was difficult still | |||
Image:2023_04 parking pad 1.jpg | |||
Image:2023_04 parking pad 2.jpg | |||
Image:2023_04 parking pad 3.jpg | |||
Image:2023_04 truck turnaround 1.jpg|The truck turnaround, and loop around electric pole for parking pad | |||
Image:2023_04 Addition Rebar 1.jpg | |||
Image:2023_04 Addition Rebar 2.jpg | |||
Image:2023_04 Addition Rebar 3.jpg | |||
Image:2023_04 Addition Rebar 4.jpg | |||
Image:2023_04 Addition Rebar 5.jpg | |||
Image:2023_04 Addition Pour 1.jpg | |||
Image:2023_04 Addition Pour 2.jpg | |||
Image:2023_04 Addition Pour 3.jpg | |||
Image:2023_04 Addition Pour 4.jpg | |||
Image:2023_04 Addition Pour 5.jpg | |||
Image:2023_04 Addition Pour 6.jpg | |||
Image:2023_04 Addition Pour 7.jpg | |||
Image:2023_04 Addition Slab 1.jpg|Cured garage slab on our side | |||
Image:2023_04 Addition Slab 2.jpg | |||
Image:2023_04 Addition Slab 3.jpg | |||
Image:2023_04 Addition Slab 4.jpg | |||
Image:2023_04 Addition Slab 5.jpg | |||
Image:2023_04 Addition Slab 6.jpg | |||
Image:Addition 2023_04 Slab 7.jpg | |||
Image:2023_04 Tear Planting 1.jpg|Framing the 'plantings teardrop' | |||
Image:2023_04 Tear Planting 2.jpg|coinduit for sprinkler piping and wire to both driveway edges | |||
Image:2023_04 Tear Planting 3.jpg | |||
Image:2023_04 Tear Planting 4.jpg|The pour is complete | |||
Image:2023_04 Tear Planting 5.jpg|A deep greenspace/planting bed | |||
Image:2023_04 Our Measurement.jpg|Just under 30' on our side of the pad, garage to fountain curb | |||
Image:2023_04 Parents Measurement.jpg|And Joe and Carolyn get about 1/2" less than us from their garage to fountain curb | |||
Image:2023_04 Addition Sawcut 1.jpg|Sawcutting a diamond pattern into the slab for expansion | |||
Image:2023_04 Addition Sawcut 2.jpg | |||
Image:2023_04 Fiber 1.jpg|The fiber line for our internet was cut during the construction (twice) so we mounted it overhead until the work is done | |||
Image:KHAO gate 24ft width.jpg|And example of a large electric rolling gate, wider than ours, although we expect to have a prettier gate | |||
Image:KHAO gate operator.jpg|Typical gate operator | |||
Image:2023_04_24 Drainage 1.jpg|Drainage needs around parking pad | |||
Image:2023_04_24 Drainage 2.jpg | |||
Image:2023_04_24 Drainage 3.jpg | |||
Image:2023_04_24 Drainage 4.jpg | |||
Image:2023_04_24 Barb Tree 1.jpg|Our neighbor Barb is cleaning up her backyard in preparations to plant some shrubs to restore her privacy, and found a dead tree on the border of our yards | |||
Image:2023_04_24 Barb Tree 2.jpg|The dead tree has been felled | |||
Image:2023_04_24 Barb Treeline 1.jpg|This is the other property line, the monument is under this rock with the leveling stones under it | |||
Image:2023_04_24 Right Gate Prep 1.jpg|The evergreen tree on the right side has been removed to make room for the driveway and gate/fence | |||
Image:2023_04_24 Right Gate Prep 2.jpg | |||
Image:2023_04_24 Right Gate Prep 3.jpg|Much roomier | |||
Image:2023_04_24 Melt Pad Openings 1.jpg|Core drilled opening in slab for meltpad tubing and electrical connections | |||
Image:2023_04_24 Melt Pad Openings 2.jpg | |||
Image:2023_04_24 Melt Pad Heating Design.jpg|Design of the meltpad heating system/tubing arrangement | |||
Image:2023_05_03 Szoke Courtyard Pour 1.png|Szoke Courtyard pour | |||
Image:2023_05_03 Szoke Courtyard Pour 2.png|Szoke Courtyard pour | |||
Image:2023_05_03 Szoke Courtyard Pour 3.png|Szoke Courtyard pour | |||
Image:2023_05_03 Szoke Courtyard Pour 4.jpg | |||
Image:2023_05_03 Szoke Courtyard Pour 5.jpg | |||
Image:2023_05_03 Heat Pad Tubing 1.jpg|Snow melt pad heating coils | |||
Image:2023_05_03 Heat Pad Tubing 2.jpg|Wiring to the sensor... it won't heat if it isn't covered in snow | |||
Image:2023_05_03 Heat Pad Tubing 3.jpg|Tubes come into manifold, which will go to heater and pump | |||
Image:2023_05_03 Heat Pad Tubing 3.jpg|Fancy manifold | |||
Image:2023_05_03 Heat Pad Tubing 4.jpg | |||
Image:2023_05_03 Heat Pad Tubing 4.jpg | |||
Image:2023_05_03 Heat Pad Tubing 5.jpg|Wiring to various locations around courtyard (lights, gate operator, etc.) | |||
Image:2023_05_03 Heat Pad Tubing 6.jpg | |||
Image:2023_05_03 Heat Pad Tubing 7.jpg | |||
Image:2023_05_03 Heat Pad Tubing 8.jpg | |||
Image:2023_05_03 Heat Pad Tubing 9.jpg | |||
Image:2023_05_03 Heat Pad Tubing 10.jpg | |||
Image: | |||
Image:2023_05_12 Pillar by parking pad.jpg|Pillars by courtyard, left/parking side. There will be a maildrop and personnel gate here | |||
Image:2023_05_12 Pillar by old garage.jpg|Pillar on old site, with fiber conduit cross under driveway | |||
Image:2023_05_12 Driveway drain 1.jpg | |||
Image:2023_05_12 Driveway drain 2.jpg | |||
Image:2023_05_12 Driveway drain 3 Fiber.jpg | |||
Image:2023_05_12 fiber conduit.jpg|Fiber under driveway | |||
Image: | |||
Image: | |||
Image:2023_05_15 Parking Pour 1.jpg | |||
Image:2023_05_15 Parking Pour 2.jpg | |||
Image:2023_05_15 Parking Pour 3.jpg | |||
Image:2023_05_15 Parking Pour 4.jpg | |||
Image:2023_05_15 Parking Pour 5.jpg | |||
Image:2023_05_15 Parking Pour 6.jpg | |||
Image:2023_05_15 Parking Pour 7.jpg | |||
Image:2023_05_15 Parking Pour 8.jpg | |||
Image:2023_05_15 Parking Pour 9.jpg | |||
Image:2023_05_15 Parking Pour 10.jpg | |||
Image:2023_05_15 Parking Pour 11.jpg | |||
Image:2023_05_15 Pad Drain 1.jpg|Trench drain for getting snow melt away | |||
Image:2023_05_15 Pad Drain 2.jpg | |||
Image:2023_05_23 Parking 1.jpg | |||
Image:2023_05_23 Parking 2.jpg | |||
Image:2023_05_23 Parking Drain 1.jpg | |||
Image:2023_05_23 Parking Drain 2.jpg | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Left Side === | |||
<hovergallery> | |||
Image:2023_04 Main Drive 1.jpg|preparing to move towards the street | |||
Image:2023_04 Old Driveway Prep 1.jpg|preping the old site of the driveway | |||
Image:2023_04 Old Driveway Prep 2.jpg|and removing the trees that were in the way | |||
Image:2023_04 Old Driveway Prep 3.jpg | |||
Image:Shub Removal.jpg|We will also update the lanscaping/shrubs next to the house, and are pruning everything back aggressively | |||
Image:2023_04 Addition Rebar 6.jpg|Preping rebar for slap to parking pad, teardrop, and exit | |||
Image:2023_04 Addition Pour 9.jpg | |||
Image:2023_04 Addition Pour 10.jpg | |||
Image:2023_04 Addition Pour 11.jpg | |||
Image:2023_04_24 Left Gate Pour 4.jpg|Commerical trench drain/grating | |||
Image:2023_04_24 Left Gate Pour 5.jpg | |||
Image:2023_04_24 Left Gate Pour 6.jpg | |||
Image:2023_04_24 Left Gate Pour 7.jpg | |||
Image:2023_04_24 Left Gate Pour 8.jpg | |||
Image:2023_04_24 Left Gate Pour 9.jpg | |||
Image:2023_04_24 Left Gate Pour 10.jpg | |||
Image:2023_04_24 Left Gate Pour 11.jpg | |||
Image:2023_04_24 Left Steet Prep 1.jpg|This is where our water meter is,and the gas line passes through here as well... they're going to build it up to the right height | |||
Image:2023_04_24 Left Steet Prep 2.jpg|Gas meter | |||
Image:2023_04_24 Left Steet Prep 3.jpg | |||
Image:2023_04_24 Left Steet Prep 4.jpg | |||
Image:2023_04_24 Left Steet Prep 5.jpg|Cover reinstalled | |||
Image:2023_04_24 Left Steet Prep 6.jpg | |||
Image:2023_04_24 Left Steet Prep 7.jpg | |||
Image:2023_04_24 Left Steet Prep 8.jpg | |||
Image:2023_04_24 Left Steet Prep 9.jpg|Framing the sidewalk | |||
Image:2023_04_24 Left Steet Prep 10.jpg | |||
Image:2023_04_24 Left Steet Prep 11.jpg | |||
Image:2023_04_24 Left Steet Prep 12.jpg | |||
Image:2023_04_24 Left Steet Prep 13.jpeg|Left side with gravel and rebar, ready for pour | |||
Image:2023_04_24 Left Steet Prep 14.jpeg|and extra gravel to cover muddy right side | |||
Image:2023_04_24 Left Steet Prep 15.jpeg|Water meter bod will get a new grating as well | |||
Image:2023_04_24 Left Steet Prep 16.jpeg|The apron gets to rebar in case the village needs to cut it, but will be 6" thick | |||
Image:2023_04_24 Left Steet Prep 17.jpeg|ready to pour | |||
Image:2023_04_24 Full view left.jpg|Left side to date | |||
Image:2023_05_03 Left Street Pour 1.jpg|Pour to the street and sidewalk | |||
Image:2023_05_03 Left Street Pour 2.jpg | |||
Image:2023_05_03 Left Street Pour 3.jpg | |||
Image:2023_05_03 Left Street Pour 4.jpg | |||
Image:2023_05_03 Left Street Cured 1.jpg|Street cured | |||
Image:2023_05_03 Left Street Cured 2.jpg | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Right Side === | |||
<hovergallery> | |||
Image:2023_05_03 Right Side Prep 1.jpg | |||
Image:2023_05_03 Right Side Prep 2.jpg | |||
Image:2023_05_03 Right Side Prep 3.jpg | |||
Image:2023_05_03 Right Side Prep 4.jpg | |||
Image:2023_05_03 Right Side Prep 5.jpg | |||
Image:2023_05_03 Right Side Prep 6.jpg | |||
Image:2023_05_03 Right Side Prep 7.jpg | |||
Image:2023_05_03 Right Side Prep 8.jpg | |||
Image:2023_05_03 Right Side Prep 9.jpg | |||
Image:2023_05_03 Right Side Prep 10.jpg | |||
Image:2023_05_15 Catch Basin 1.jpg|Catch basin for runoff rebuilt | |||
Image:2023_05_15 Catch Basin 2.jpg|and enlarged to catch extra water | |||
Image:2023_05_15 Catch Basin 4.jpg|And brought up to the level of the trench | |||
Image:2023_05_15 Catch Basin 5.jpg | |||
Image: | |||
Image: | |||
Image:2023_05_03 Right Side Pour 1.jpg | |||
Image:2023_05_03 Right Side Pour 2.jpg | |||
Image:2023_05_03 Right Side Pour 3.jpg | |||
Image:2023_05_03 Right Side Pour 4.jpg | |||
Image:2023_05_03 Right Side Pour 5.jpg | |||
Image:2023_05_03 Right Side Pour 6.jpg | |||
Image:2023_05_15 Right SIde Pour 1.jpg | |||
Image:2023_05_15 Right SIde Pour 2.jpg | |||
Image:2023_05_15 Right SIde Pour 3.jpg | |||
Image:2023_05_15 Right SIde Pour 4.jpg | |||
Image:2023_05_15 Right SIde Pour 5.jpg | |||
Image:2023_05_15 Right SIde Pour 6.jpg | |||
Image:2023_05_15 Right SIde Pour 7.jpg | |||
Image: | |||
</hovergallery> | |||
=== Blemishes === | |||
<hovergallery> | |||
Image:2023_04_24 Bad Finish 1.jpg|Some of the pours were so big there were blemishes evident in the finish work | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image:2023_05_12 step repair 1.jpg|Rear step repair | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Property Line/Survey Documentation === | |||
Here is some documentation of the property line from the survey we had done.<br/> | |||
On the North side (925) in the back the property line is just outside of the old wire fencing, outside of the white fencing and beyond the new gas installation and well outside of the chain link fencing in the back corner. There is an old abandoned well or sewer access behind the chainlink fence.<br/> | |||
Across the back the property line is just outside of the chainlink fence. There is a momument at the Trelawny back corner, and on the tennis/dog run corner.<br/> | |||
On the Trewlany (915/935) side (South), the property is just inside the split rail fence where the tennis court used to be, but we own the dog run, and the side yard runs just inside the split rail fence.<br/> | |||
Across the front, there is a momument just outside the fence on the 925/915 corner, and the property runs just outside the fence to a monument just beyond the garage near the driveway.<br/> | |||
<hovergallery> | |||
Image:Survey.jpg|Pins associated to images | |||
Image:IMG_8329.jpg|This shows that our side yard cuts across the yellow house's (925) driveway in line with the middle rail in their fence | |||
Image:IMG_8330.jpg|towards white fence | |||
Image:IMG_8331.jpg|from gas pad towards white fence | |||
Image:IMG_8332.jpg|Near pool pump drain | |||
Image:IMG_8333.jpg|Further back outside of fence line | |||
Image:IMG_8334.jpg|Further back outside of fence line | |||
Image:IMG_8335.jpg|Further back outside of fence line | |||
Image:IMG_8336.jpg|Further back outside of fence line, and well outside of chain link | |||
Image:IMG_8337.jpg|Corner | |||
Image:IMG_8338.jpg|Middle of the backyard, outside of fence where old tree fell and took the fence down | |||
Image:IMG_8339.jpg|Backyard nearer tennis court | |||
Image:IMG_8340.jpg|Monument near edge of old tennis court on Trelawny side | |||
Image:IMG_8341.jpg|Momument to Trelawny back corner, stick is behind the tree | |||
Image:IMG_8342.jpg|Along edge of old tennis court/dog run - 2 markers showing we own the dog run | |||
Image:IMG_8343.jpg|Side yard inside fence at 915 garage | |||
Image:IMG_8344.jpg|Side yard inside fence at 915 courtyard | |||
Image:IMG_8345.jpg|Side yard Outside fence at 915 pool | |||
Image:IMG_8346.jpg|Side yard inside fence at 915 cabana | |||
Image:IMG_8347.jpg|From Cabana stick to corner stick | |||
Image:IMG_8348.jpg|Side yard inside fence at gate to Trelawny | |||
Image:IMG_8349.jpg|Corner post outside of fence | |||
Image:IMG_8350.jpg|Rear corner of propery (Southwest/Trelawny/915 end) - just behind the fencing | |||
Image:IMG_8351.jpg|Corner at Trelawny/tennis court/dog run | |||
Image:IMG_8352.jpg|Creepy old well or sewer opening | |||
Image:IMG_8353.jpg|Monument on corner behind yellow Beale mother's home and Trelawny | |||
Image:IMG_8354.jpg|Location of corner, beyond the fence near compost heap | |||
Image:IMG_8355.jpg|Property line at garage corner beyond fence | |||
Image:IMG_8356.jpg|Property line at garage corner beyond fence | |||
Image:IMG_8357.jpg|Line of property at fence rown | |||
Image:IMG_8358.jpg|Looking towards Congress | |||
Image:IMG_8359.jpg|Corner marker | |||
Image:IMG_8360.jpg|Monument | |||
Image:IMG_8361.jpg|Driveway corner looking down property line | |||
Image:IMG_8362.jpg|Concrete marker at Congress corner south (925) side | |||
Image:IMG_8363.jpg|North side of driveway at 935 garage, looking North | |||
Image:IMG_8364.jpg|North side of driveway in bushes 1/2 down | |||
Image:IMG_8365.jpg|North property line next to 925 garage | |||
Image:IMG_8366.jpg|North corner @ 935 and 941 | |||
Image:IMG_8367.jpg|North end against 941 | |||
Image:IMG_8368.jpg|North end against 941 just before new gas installation | |||
Image:2023_05_15 Easement ot Property 1.jpg|The driveway rides just outside of the easement | |||
Image:2023_05_15 Easement ot Property 2.jpg|which has a notch | |||
Image:2023_05_15 No Trespass 1.jpg|Here we've had to post no trespass signs because the neighbors kept coming over and bothering our workers | |||
Image:2023_05_15 No Trespass 2.jpg| | |||
Image:2023_05_15 No Trespass 3.jpg| | |||
</hovergallery> | |||
=== Mo' Neighbors, Mo' Problems === | |||
<hovergallery> | |||
Image:2023_04_28 Barb hassling Rod.jpg|The problem with having jealous neighbors that live in cracker boxes... they lash out at your employees, cussing and flipping them off, like our architect getting a earful from the "good Catholic grandmother" next door.... | |||
Image:2023_05_03 Sandra Roofline 1.jpg|The ridiculously ugly roofline on Sandra's addition | |||
Image:2023_05_03 Sandra Roofline 2.jpg| | |||
Image:2023_05_03 Sandra Port-o-potty 1.jpg|Sandra's port-o-let is on our property, so we put ours next to it (she didn't want to share...) | |||
Image:2023_05_03 Sandra Pole 1.jpg|Sandra needs upgraded electrical service, and we were willing to put in a conduit under our new driveway if she signed a waiver to agree to never dig up my driveway (and no new easement). She wouldn't, so she gets a new pole (in HER yard)... | |||
Image:2023_05_03 Sandra Honeysuckle 1.jpg|Barb and Sandra are on the hook for maintaining the easement, but the honeysuckle shows that they have not been doing so | |||
Image:2023_05_03 Sandra Honeysuckle 2.jpg| | |||
Image:2023_05_03 Sandra Honeysuckle 3.jpg| | |||
Image:2023_05_03 Sandra Honeysuckle 4.jpg| | |||
Image:2023_05_03 Sandra Fence 1.jpg|Sandra's ugly split-rail fence is on my property (not even in the easement... | |||
Image:2023_05_03 Sandra Fence 2.jpg|...we've notified her in writing that we will be removing it... | |||
Image:2023_05_03 Sandra Fence 3.jpg|...she's told us "she doesn't consent"... ah, it's my property, so that's not really an issue... | |||
Image:2023_05_03 Sandra Debris 1.jpg|And Sandra has extensive construction debris on our property... we've demanded it be removed... | |||
Image:2023_05_03 Sandra Debris 2.jpg|... and asked for a silt fence... which she hasn't done.... which shows both contempt and malice... | |||
Image:2023_05_03 Sandra Debris 3.jpg|... so we have exchanged lawyer's names... | |||
Image:2023_05_03 Sandra Debris 4.jpg| | |||
Image:2023_05_15 Split Fence 1.jpg|And here is the begining of the end of the fence at issue | |||
Image:2023_05_15 Split Fence 2.jpg| | |||
Image:2023_05_15 Split Fence 3.jpg| | |||
Image:2023_05_15 Split Fence 4.jpg| | |||
Image:2023_05_03 Barb Trees 1.jpg|Meanwhile, Barb has planted trees on my property up against the new driveway... we've told her they must move 5' away... | |||
Image:2023_05_03 Barb Trees 2.jpg|... which she has ignored, so our lawyer will now demand they move onto her property entirely... | |||
Image:2023_05_03 Donna Fence 1.jpg|And finally, Ms. Donna... she didn't get this fence approved by the historical committee nor permitted... | |||
Image:2023_05_03 Donna Fence 2.jpg|...so we'll be asking for it to be removed... and the finished side is required to face the neighbor, but the chicken faces us... | |||
Image: | |||
</hovergallery> | |||
=== Lights === | |||
Driveway lights are [https://www.aspectled.com/ AspectLED] 3W 12V 2 hole lamps ([https://www.aspectled.com/in-ground-stainless-steel-pathway-light-3w AL-IG-PW-A2S-DW-12VDC-2FT DayWhite 6000K]) with sleeves (Mounting [https://www.aspectled.com/mounting-sleeve-for-pathway-light-al-ig-a21 Sleeve for Pathway Light AL-IG-A21]) powered by 100W supply ([https://www.aspectled.com/100-watt-led-power-supply 100 Watt LED Power Supply AL-PS-W-100-12]).<br> | |||
<hovergallery> | |||
Image:driveway lighting conduit.jpg|Schedule 40 pipe conduit to light fitting | |||
Image:driveway lights 1.jpg|AspectLED 12V 3W | |||
Image:driveway lights 2.jpg | |||
Image:driveway lights 3.jpg | |||
Image:driveway lights 4.jpg | |||
Image:driveway lights 5.jpg | |||
Image:driveway lights 6.jpg | |||
Image:driveway lights 7.jpg | |||
Image:driveway lights 8.jpg | |||
Image:driveway lights 9.jpg | |||
</hovergallery> | |||
== Basement Remodel == | |||
We bought this house to get closer to the city, but still have some property and privacy, and to move my in-laws in. They don't need help <i>now</i>, but they might someday, and my wife wanted to be able to spend some quality time with them as they enjoy their retirement. We wanted to get them single-floor living, so if they do end up needing surgeries or have any mobility issues it won't be that hard, but we didn't want to give up having our own very nice space either. | |||
This house provided that opportunity, it's large enough, and although it has a sunken family room and a couple steps to get into, is pretty flat with a first floor master, kitchen, laundry, and office for them. It also sits well up, so the spacious basement is only about 3' under grade, and so we were able to put in lots of windows and build a complete second master bedroom, bath, closet, full office, kitchen, and family room in the basement, in addition to a billiards room (it came with a table) and the [[Camp_Kiwi_Data_Center|data center]]. | |||
It has 3 bedrooms upstairs for guests, and with the geothermal heating and air system we were able to zone it with 7 independent zones of heating an air so everyone can be comfortable (and we have tankless hot water for unlimited showering and laundry). When done it will really be <i>extremely</i> nice. One of the nice features of this home is every floor has a long, straight central hallway with stairs at both ends. This does make it hard to locate people, though, as it's big and they might be using the other stairwell. | |||
A nice feature that I worked into the basement remodel is sound throughout. Our last house had built-in speakers, and I really liked it. I'd paired those (driven by simple stand-alone amplifiers) to Apple Airport Express units so I could "Airplay" music to them. Around the time we moved I got interested in the Sonos Connect:Amp product as an integrated amplifier and connected-device in one unit. I picked up a few for the first floor and really liked those, so I bought a bunch (7) more for the basement and threw them into the [[Camp_Kiwi_Data_Center|data center]], one for each major room (although the master bedroom and closet share a unit/zone). I wanted to keep the power and data infrastructure in the rack, with UPS (battery backup) and the Tivos, etc. so I mounted local volume controls in each room and ran the main speaker wire back to the [[Camp_Kiwi_Data_Center|data center]]. This is nice because although you can control the overall volume from the Sonos app, and easily group and ungroup the Amps into multiple independent areas and individually or collectively control the volume, sometimes when you're actually in the room it seems too loud. The Sonos allows a lot of different music sources, Apple Music, Amazon, Plex, your iTunes library, TuneIn, and Line in. I'm using one Line In from an Airport Express to enable Airplay, which the original Sonos do not support, and I had another big idea. My older Apple TV (the new ones did away with it) and Tivos all have Digital Audio Output. I ran Toslink/SPDIF cable from each TV location to the [[Camp_Kiwi_Data_Center|data center]], and picked up some digital-to-analog converters for the [[Camp_Kiwi_Data_Center|data center]] and connected the analog side to the individual Sonos amps, and now I can output my TV sound to the built-in speakers! Too cool, and great for Superbowl parties and the like. | |||
Another idea this enabled is the "TV behind a 2-way mirror" trick! I built in a TV mount behind my vanity mirror and placed electric, network, and digital audio inside the space, and an IR receiver/retransmitter into the mirror mount so I could turn the TV on and off, and now I can watch TV through the mirror and get the sound on the in-ceiling speakers!<br/><br/> | |||
<hovergallery> | |||
Image:P1040736.jpg|It came with a fountain! | |||
Image:P1040737.jpg|This is what it looked like before we started wrecking it. Lovely | |||
Image:P1040740.jpg|A light sensor for the outdoor lighting! | |||
Image:IMG_4468.jpg|Existing layout upstairs | |||
Image:IMG_4471.jpg|First Floor | |||
Image:IMG_4588.jpg|Moving in | |||
Image:P1040182.jpg|We gutted the basement and started from scratch | |||
Image:P1040183.jpg|This water heater gets moved, and this back section becomes our master closet | |||
Image:P1040184.jpg|This piping comes into the kitchen island | |||
Image:P1040185.jpg|The existing shower will be replaced, and the geothermal lines will enter here | |||
Image:P1040186.jpg|Shower room | |||
Image:P1040187.jpg|These lights were over the old shower vanity, now this will be an opening into the addition | |||
Image:P1040748.jpg|Vanity lights from another angle | |||
Image:P1040188.jpg|Utility room, our laundry will go next to here | |||
Image:P1040189.jpg|Laundry connections | |||
Image:P1040190.jpg|These windows will get bigger, and another will be added | |||
Image:P1040191.jpg|Master shower drain | |||
Image:P1040192.jpg|Master vanity plumbing | |||
Image:P1040193.jpg|5'x9' master shower with two 8' linear drains | |||
Image:P1040743.jpg|the shower slopes to the linear drain side | |||
Image:P1040194.jpg|Because we have two 4' linear drains in the shower, with 2 rain heads, a handwand, and 6 body sprays we need a larger drain pipe to the sewer | |||
Image:P1040741.jpg|Master Vanity with have a TV behind a 2-way mirror | |||
Image:P1040162.jpg|We moved a post to make the family-to-kitchen opening larger, so we had to pour a new footer | |||
Image:P1040163.jpg|Old post location, and new footer | |||
Image:P1040164.jpg|Reducting to add zone control | |||
Image:P1040165.jpg | |||
Image:P1040166.jpg|Billards storage | |||
Image:P1040167.jpg|Preparing for the data center | |||
Image:P1040168.jpg|Data center will have a raised floor, partly to hide wire chases, partly to protect from water intrusion | |||
Image:P1040169.jpg|Pulling cable to data center (cat 6a) | |||
Image:P1040171.jpg|Split AC unit for data center | |||
Image:P1040172.jpg|Data cabling in hallway | |||
Image:P1040202.jpg|Temporary network | |||
Image:P1040203.jpg | |||
Image:P1040204.jpg | |||
Image:P1040205.jpg|Data Center wall/door - an 8 footer! | |||
Image:P1040755.jpg|Server power | |||
Image:P1040174.jpg|Exercise equipment | |||
Image:P1040175.jpg|Kitchen plumbing | |||
Image:P1040176.jpg|Reframing | |||
Image:P1040180.jpg|That's the office, and that window gets replaced | |||
Image:P1040742.jpg|Looking into the master bathroom | |||
Image:P1040744.jpg|Billards room framed | |||
Image:P1040747.jpg|New window in master bedroom | |||
Image:P1040749.jpg|An angled hall will connect the master closet to the bath, so when one of us gets up we can close the bedroom off and move back and forth without distrubing anyone | |||
Image:P1040177.jpg|This beam needs reinforced as we're pulling a column out | |||
Image:P1040178.jpg|It got full-length 'C' channels on both sides | |||
Image:P1040179.jpg|and the wood suport on this end was reinforced with steel | |||
Image:P1040197.jpg|Before pulling the post (the wall will no longer be under this beam) | |||
Image:P1040198.jpg|The beam on the other end of the master bedroom gets the same treatment | |||
Image:P1040199.jpg|HVAC reducted in closet | |||
Image:P1040181.jpg|My office, these windows get bigger | |||
Image:P1040195.jpg|Voila! | |||
Image:P1040196.jpg|A lot of ductwork | |||
Image:P1040201.jpg|Powder room plumbing | |||
Image:P1040753.jpg|More powder room | |||
Image:P1040732.jpg|Cameras mounted around the house | |||
Image:P1040733.jpg|Including Ring flood light cameras | |||
Image:P1040734.jpg|And Ubiquiti UVC-Pro cameras | |||
Image:P1040735.jpg | |||
Image:P1040762.jpg | |||
Image:P1040763.jpg | |||
Image:IMG_5825.jpg|Basement kitchen island waterproofing | |||
Image:IMG_5879.jpg|Starting basement tile | |||
Image:IMG_4465.jpg|Multi-zone climate controls | |||
Image: | |||
Image:IMG_8517.jpg|Water shutoff under basement steps | |||
Image: | |||
Image: | |||
Image:2023_05_12 Guest Bath Cabinet.jpg|Bath Cabinet | |||
Image:2023_05_12 Guest Bath body wash.jpg|Body Washes installed | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Basement Master Bedroom === | |||
Our master bedroom is about 17'x18' with french doors opening to the rear stairway next to the "extra" shower and basement entrance to the addition. The addtion has a walkout set of french doors that gives us easy access to the hot tub. We enlarged the window area to three 3'x5' windows for natural light, which open to the side yard at grade behind the addition overlooking the wooded creek, so it's pretty private. The master has it's own zone of HVAC, a security panel, and connects to a small hallway between the master bath and closet thorugh a pocket door so I can get up and get ready for work without distrubing Elizabeth. It has 9' ceilings iwth a fan, and the same brushed, exterior-grade Italian marble that the basement has thorughout. <br/> | |||
The electrical outlets above the windows are for HomeKit remote controlled/powered blinds or shades that will open and close automatically based on time of day, day of the week, and weather (or difference between indoor and outdoor temperature and sunniness). <br/> | |||
<hovergallery> | |||
Image:IMG_8957.jpg|Grading outside windows | |||
Image:IMG_6490.jpg|Our new motion bed with TemperPedic mattress, the two sides are separate and can lift your legs/head separately for watching TV or if you have the sniffles | |||
Image:IMG_6530.jpg|Bedroom TV | |||
Image:IMG_6339.jpg|Master Bedroom | |||
Image:IMG_6101.jpg|Basement master bedroom tile complete, Ikea cabinet paks for closet | |||
Image:IMG_6425.jpg|Master fan and windows, and in-ceiling sound, and note the glass-break sensor near the windows for security | |||
Image:IMG_6429.jpg|Master bedroom window to walkout | |||
Image:IMG_6430.jpg|Master bedroom window to back yard | |||
Image:IMG_6351.jpg|Hallway entrance to master (solid french doors) near addition connection - this will not have a door once it's heated, office is to the right of this picture and the extra shower is directly across from the master next to the stairs | |||
Image:IMG_6432.jpg|3 Views of the connector hallway, from Bedroom (note the thermostat and security panel near doorway) | |||
Image:IMG_6431.jpg|...from Bathroom, closet ahead, bedroom to the right... | |||
Image:IMG_6433.jpg|...and from closet to bathroom, bedroom to the left | |||
</hovergallery> | |||
=== Basement Master Closet === | |||
The master closet is about 18'x18' with an additional pocket of about 9'x4' where our stacking washer and dryer will go. It has sound, just like every other room in the basement, and the walls are covered with IKEA storage cabinets with white glass doors with soft-close sliders and automatic lighting that comes on when the door is opened. This will provide tons of hanging storage as well as a bunch of shelving, and a (not yet pictured/installed) island will house our sundries (socks and undies) and give us a place to lay your wallet and keys down while changing, and it will have a bench on either end to sit on while you put your shoes and socks on. I really, really like everything to be tidy, and these cabinets are a nice compromise since Elizabeth doesn't ahve to put everything away every single day for it to appear tidy.<br/> | |||
The closet, like most of the rooms in the basement has HomeKit WiFi controllable, and dimmable lighting switches in the wall, so that with dimmable LED bulbs mounted I can achieve nearly any lighting level. My idea is to have a motion sensor in the connector hallway (which has it's own lighting circuit) that will turn on the lights in the master bathroom and closet at a low (15% mabye) level when I get up so I can safely reach them, but dim enough not to disturb anyone until I can get the pocket door closed behind me. Then I can raise the light level to whatever level I want. <br/> | |||
In the rear wall are shut-off valves for the water going to the pool cabana. We had them piped to the drain in the utility room while we were building, so we can just open the access panel and drain the cabana each fall directly to the sewer. Around the corner from the main set of cabinets is a nook for a full size stackable washer/dryer.<br/> | |||
<hovergallery> | |||
Image:IMG_6492.jpg|Ikea Cabinets with automatic lighting | |||
Image:IMG_6342.jpg|Master Closet - The main power closet is the back | |||
Image:IMG_6341.jpg|Basement master closet cabinets (IKEA) | |||
Image:IMG_6426.jpg|Closet coffered ceiling with sound (chandlier coming) | |||
Image:IMG_8894.jpeg|Center island with stone countertop, with changing benches | |||
Image:IMG_6207.jpeg|Island with benches for shoes/socks | |||
Image:IMG_5000.jpeg|Center island isntalled | |||
Image:IMG_6102.jpg|Basement master bedroom closet tile complete - the grey conduit is power to the island cabinet | |||
Image:IMG_6227.jpg|Master Closet | |||
Image:IMG_6228.jpg|Master Closet, the open space next to the utility closet will be Elizabeth's makeup table with mirror and chair | |||
Image:IMG_6340.jpg|Master Closet - This is a little shallow cubby that we just mounted doors on, probably for shoes and sweaters | |||
Image:IMG_6427.jpg|Island cabinet for scale (not the actual cabinet) | |||
Image:IMG_6428.jpg|Closet trimmed | |||
Image:IMG_6436.jpg|Rear of closet to W/D area...closer... | |||
Image:IMG_6435.jpg|Rear of closet to W/D area...closer... | |||
Image:IMG_6434.jpg|Washer/Dryer hookups...Viola! | |||
Image:IMG_6448.jpg|Shoe bars | |||
Image:IMG_6451.jpg|Double shirt hanging | |||
</hovergallery> | |||
=== Basement Master Bathroom === | |||
The master bathroom is about 15'x15', with a 9'x5' glass surround shower as the main feature, and a double vanity. Behind the mirror on my side of the vanity is a TV, with the sound wiring I mentioned above so I can listen to the morning new on the built in speakers from my Tivo or watch AppleTV. These both have RF remotes, but I have a IR repeater for the TV on/off function. The toilet is next to the shower, and as I mentioned we installed 2 of the largest tankless water heaters to make sure we can run both sets of rainheads and body-sprays without running out of hot water. The shower surround is marble countertop material, so it's way thicker than it needs to be, and we decided to cover the entire wall since the glass will give the room a seamless look.<br/> | |||
Note that the floor has zero transition, but gently slopes to the back wall where the shower heads are. The glass surround will have a center door, and you can just see that there is a trench drain about 6" wide with a removable stone inlay, with about 1/4" drain slit all the way around, 4' wide for each shower head. Similarly the ceiling is gently sloped towards the back wall (since the entire space is enclosed) to keep moisure from forming on the tile overhead and dripping on us. Instead it will gently flow towards the drains as well. The glass will be treated with a special anti-spotting coating. Also note that we have installed "real" grab-bars in the shower and at all the toilets in the basement. For one, it's nice to have something to grab onto, and for two I hate seeing tile broken by a soap dish that's been pulled away. And since we installed all 3' doors in the basement, it's technical ADA compliant should it ever need to be. And it'll be nice the next time one of us wrenches a back. :-)<br/> | |||
The door to the hallway will probably never really get used as the bath also has a door out the back to the pantry, and from there to the kitchen which is what I'm sure we'll use the majority of the time. Also note the center cabinet that will hide Elizabeth hair dryer, spin toothbrush, and curling iron, etc., with outlets inside. It cleverly lifts up for access, again to get things tidy.<br/> | |||
<hovergallery> | |||
Image:IMG_6790.jpg|Installed grab bars | |||
Image:IMG_0892.jpg|Shower Surround/glass going in | |||
Image:IMG_2488.jpg|Shower Surround/glass going in | |||
Image:IMG_5832.jpg|Shower Surround/glass going in | |||
Image:IMG_5944.jpg|Shower Surround/glass going in | |||
Image:IMG_6479.jpg|Master Bathroom Shower (now with extended arms for the Rain heads) | |||
Image:IMG_6480.jpg|Rain heads | |||
Image:IMG_6218.jpg|Master Bathroom Shower | |||
Image:IMG_6370.jpg|Basement master shower fixtures installed | |||
Image:IMG_6176.jpg|Basement Master Shower Ceiling Tile Installed | |||
Image:IMG_6348.jpg|Master Bathroom | |||
Image:IMG_6504.jpg|Hidden TV-Still working on placement and shading | |||
Image:IMG_6529.jpg|Hidden TV, final location - allows me to shave and see myself, and I worked out the shading to get best light through the mirror | |||
Image:IMG_6509.jpg|2-Way Mirror for hidden TV | |||
Image:IMG_6512.jpg|Mirrors and faucets | |||
Image:IMG_6172.jpg|Basement Master Bath Cabinets | |||
Image:IMG_6175.jpg|Basement Master Bath Cabinets | |||
Image:IMG_6349.jpg|Master Bathroom to hallway and office | |||
Image:IMG_6437.jpg|Cabinet for hair dryer, etc. | |||
Image:IMG_6438.jpg|Center cabinet | |||
Image:IMG_6439.jpg|Master bath vanity sink | |||
Image:IMG_6440.jpg|Exit to pantry, toilet | |||
Image:IMG_6457.jpg|Framing for vanity mirrors | |||
Image:IMG_6470.jpg|Hidden TV behind mirror | |||
Image:IMG_6471.jpg|IR Receiver for TV power and Apple TV | |||
Image:IMG_6472.jpg|Mirror frames | |||
</hovergallery> | |||
=== Basement Kitchen === | |||
The kitchen gets the same stone Versailles pattern as the rest of the basement. It's way more kitchen than we really need, but in a million dollar home, you kind of need to do certain finish levels. The kitchen is about 18'x18' with another 15'x5' or so for our dining room table. It has a large island in the middle with a overhanging bar area for stools with the sink and diswasher built-in. The opposite wall will have a fancy Wolf gas range, and stainless fridge and microwave with full-height stone backsplash. The vent required for such a large range was problematic and required additional make-up air provisions I don't even want to think about. <br/> | |||
All of the cabinets are internally lighted with drawer lights that come on when opened, a feature we really liked in our old house's IKEA cabinets. The upper cabinets have downlighting as well as hidden outlets so that there are no vible openings in the stone. The same is true on the island were the outlets are mounted on the sides in the cabinets, and all of the drawers are soft-close. We got all Wolf/Cove/Sub-Zero (it's one company) appliances, except the main fridge. There's a mini fridge in the bar for pool or TV drinks, and the dishwasher has LED lights inside and WiFi, as well as a light system that shows if the load is done because it's so quiet. A red dot on the floor means it's running, green means done (see below).<br/> | |||
The "Dining Room" is just a little slice of the kitchen and family room stolen for the table, but it's more than we really need, especially with the stools on the edge of the kitchen island. On the long (rear of house) end of the kitchen/dining space is a wall of cabinets, the uppers of which are non-functional - they hide a HVAC duct and soffit, but the lowers are also lighted and have more adjustable pantry shelving. There is a door between the kitchen and the coffee bar/pantry that is decorated/hidden as a cabinet door.<br/> | |||
<hovergallery> | |||
Image:IMG_7689.jpeg|Cabinets with handles | |||
Image:IMG_7690.jpeg|Cabinets with IKEA Norffly automatic lighting | |||
Image:IMG_7697.jpg|Hidden door to pantry | |||
Image:IMG_6818.jpeg|Kitchen oven wall with cabinet downlights installed | |||
Image:IMG_7068.jpeg|Stove and Hood installed | |||
Image:IMG_7066.jpeg|Stove installated | |||
Image:IMG_7064.jpeg|Stove and Hood installation | |||
Image:IMG_7063.jpeg|Stove and Hood installation | |||
Image:IMG_6514.jpg|Kitchen Island | |||
Image:IMG_6796.jpg|Dining Table | |||
Image:IMG_6515.jpg|Kitchen Sink | |||
Image:IMG_6513.jpg|Sink/Island | |||
Image:IMG_6804.jpg|Cove dishwasher | |||
Image:IMG_6803.jpg|Red light shows the dishwasher is running (it's very quiet) | |||
Image:IMG_6805.jpeg|Green light shows when it's done | |||
Image:IMG_6169.jpg|Basement Kitchen Cabinets | |||
Image:IMG_6170.jpg|Basement Kitchen Island | |||
Image:IMG_6171.jpg|Basement Kitchen Cabinets | |||
Image:IMG_6100.jpg|Basement kitchen tile complete | |||
Image:IMG_6365.jpg|Basement kitchen stone backsplash installed | |||
Image:IMG_6367.jpg|Basement kitchen countertop installed | |||
Image:IMG_6375.jpg|Basement kitchen island nearing completion | |||
</hovergallery> | |||
=== Basement Pantry === | |||
The pantry is only about 8'x8', as we don't really cook much we don't need a ton of storage. But we do need a few staples, and Elizabeth piped water from the bathroom wall to where our countertop will go for her professional Keurig coffee maker. Each upper cabinet is getting under-cabinet lighting.<br/> | |||
The walls get the same subway tile as the powder room, and the one wall will get a kitty-sized door to the utility room where the litty box will be kept. The outer side of the pantry door (in the kitchen) will get cabinet doors so it blends into the cabinetry in there.<br/> | |||
<hovergallery> | |||
Image:IMG_7172.jpeg|Pantry cabinet downlighting | |||
Image:IMG_7173.jpeg|Pantry cabinet downlighting | |||
Image:IMG_7174.jpeg|Pantry cabinet downlighting | |||
Image:| | |||
Image:IMG_7166.jpeg|Subway tile installed | |||
Image:IMG_7167.jpeg|Subway tile installed | |||
Image:IMG_1973.jpeg|Main pantry counter with pro-level Keurig coffee machine (with direct water hook-up!) | |||
Image:IMG_2593.jpeg|Small cabinets on the opposite wall | |||
Image:IMG_6441.jpg|Door to kitchen, the facing side will be paneled to look like a cabinet so it blends in, water built-in on the left is for coffee maker | |||
Image:IMG_6442.jpg|Recessed pantry shelving will be heavy-duty adjustable so it can handle cans, but be changed as our needs change, and has the same glass IKEA doors as the master | |||
Image:IMG_6473.jpg|Pantry adjustable, heavy duty shelving | |||
Image:IMG_7231.jpeg|Kitty door opening trimmed | |||
Image: | |||
</hovergallery> | |||
=== Basement Office === | |||
The basement office is my room. It's got the same fan as the master, and 2 big escape-sized windows. The window well has egress stairs, and with the closets and smoke detector make it a legal bedroom. I'll make one of the closets <i>standard</i> and the other will have a bunch of extra shelves for my computer stuff. The two big windows open onto the driveway and fountain, which is nice, and bring in a bunch of light. Since we didn't want to waste that light we installed 12 light glass french doors onto the hallway. | |||
<br/> | |||
I'll have my wrap-around computer desk setup with dual monitors on my main iMac and antoher workstation for Elizabeth's MacBook or either of our work laptops. The room is wired with dual 10G copper and dual 10G fiber to the data center. Also the side wall is wired for a TV, and I plan to put my futon opposite for naps or for catching a game while I work on something. Also, since my security cameras are available on AppleTV, every one of these TVs duals as a security monitor. | |||
<br/> | |||
<hovergallery> | |||
Image:IMG_6510.jpg|My desktop and cabinets installed | |||
Image:IMG_6505.jpg|Printers and Laptop workstation | |||
Image:IMG_6511.jpg|Bedroom wall mounted TV | |||
Image:master_window_brick.jpg|Basement master bedroom window brick trim | |||
Image:IMG_6222.jpg|Office | |||
Image:IMG_6335.jpg|Office | |||
Image:IMG_6336.jpg|Office | |||
Image:IMG_6350.jpg|Basement office doors installed | |||
Image:IMG_6338.jpg|Basement office windows trimmed/framed | |||
Image:IMG_6443.jpg|Egress Well | |||
Image:IMG_6444.jpg|Egress Well, note the steps on far end | |||
Image:IMG_2227.jpg|Computer stuff closet - Heavy duty adjustable shelves | |||
Image:IMG_6474.jpg|Guest Closet - still heavy duty and adjustable, but with a close bar | |||
</hovergallery> | |||
=== Basement Family Room === | |||
The family room is 25'x20', and has a foyer and bar next to a walkout to the back yard pool area. We ran electric in the slab to where the couch will sit (it's an electric recliner, and for phone chargers or laptops, etc.), and mounted a TV mount, and added a built-in gas fireplace. | |||
The big french doors on our side of the hallway (our master suite with walk-in closet, bath, pantry, kitchen, family room, dining room, bar and walk-out the pool are all on the west side of the house's main hallway so we can close it off) can all be held open with these cool magnetic latches with built-in spring-dampener systems so they gently grab and hold the door if you open it a little too briskly. Very cool. | |||
<br/> | |||
<hovergallery> | |||
Image:59840368937__D8AF948C-3CB8-41D9-893F-F26DC673EFDF 2.JPG|New 7" OLED TV! Nice... with Sonos Sound Bar and Surrounds | |||
Image:59899308649__B1795B39-7DC2-4371-8D4A-0BAA379F2E7A.JPG|Door hold-open latches | |||
Image:IMG_6796.jpeg|Fireplace install begins | |||
Image:IMG_6813.jpeg|OLED TV on | |||
Image:IMG_6817.jpeg|Framing for Fireplace | |||
Image:IMG_6866.jpeg|Fireplace stone surround installed | |||
Image:IMG_7157.jpeg|New all-glass backdoor with new style trim | |||
Image:IMG_5253.jpg|Family room flooring going down | |||
Image:IMG_6528.jpg|Family room flooring going down | |||
Image:IMG_6445.jpg|TV mount, current plan is to get an 80" OLED 4k TV | |||
Image:IMG_6446.jpg|Built-in gas fireplace | |||
</hovergallery> | |||
<embedvideo service="youtube">https://youtu.be/pIg3xdw-3iM</embedvideo> | |||
=== Basement Bar === | |||
The bar was a tiny little mini-kitchen (without any cooktop but a fridge) when we bought the place. It wasn't big enough for our needs, so we repuposed it into a bar with a mini-fridge under counter for pool drinks mostly. I don't need a bar, but it was there... | |||
Much like the kitchen, the backwall is one large piece of stone with no opens for power outlets. Here the base of the cabinet hides the outlets and the glass-front cabinets are lighted. | |||
<hovergallery> | |||
Image:IMG_6838.jpeg|Backwall stone and cabinetry | |||
Image:IMG_6839.jpeg|Bar sink and mini-fridge | |||
Image:IMG_6867.jpeg|Bar counter top | |||
Image:| | |||
Image:| | |||
Image:| | |||
Image:| | |||
</hovergallery> | |||
=== Basement Billiards Room === | |||
The billiards room is 20'x15'. I didn't need a billiards room, but we got the table "free" when we bought the house, and everybody else wanted to keep it. | |||
<br/> | |||
<hovergallery> | |||
Image:IMG_9288.jpg|Billiards | |||
Image:IMG_6337.jpg|Billiards | |||
</hovergallery> | |||
=== Basement Powder Room === | |||
The basement powder room is just a small toilet and vanity across from the family room, with a pocket door. It's next to the "Craft room" which is very small now, and is really just a hallway to the data center.<br/> | |||
<hovergallery> | |||
Image:IMG_7165.jpeg|Vanity with mirror | |||
Image:IMG_8619.jpeg|Vanity with Faucet | |||
Image:IMG_3955.jpeg|Vanity sink | |||
Image:IMG_7164.jpeg|Herring bone subway tile | |||
</hovergallery> | |||
=== Basement Hallway === | |||
...it's a hallway... | |||
<hovergallery> | |||
Image:IMG_6373.jpg|Basement hallway tile nearing completion | |||
Image:IMG_6347.jpg|Hallway | |||
Image:IMG_6351.jpg|Hallway | |||
</hovergallery> | |||
=== Basement Shower === | |||
The extra shower and bathrooom is a nice feature. It already existed, so we thought there was no other really good use for the space, so we kept it and just made it a little smaller, giving what used to be the vanity to the hallway to the addition. It's about 8'x8' with a standup shower with subway tile and a glass surround, a toilet and small vanity. | |||
<br/> | |||
<hovergallery> | |||
Image:IMG_6786.jpg|The "Little Shower" Door | |||
Image:IMG_6787.jpg|Glass Shower Surround | |||
Image:IMG_6489.jpg|Shower | |||
Image:IMG_6223.jpg|Shower | |||
Image:IMG_6221.jpg|Shower | |||
Image:IMG_6424.jpg|Shower tile and paint | |||
Image:IMG_6216.jpg|Shower | |||
</hovergallery> | |||
=== Basement Craft Room === | |||
The craft room really doesn't have much left over after the Data Center and Powder room were broken off, but still has some cabinets and sink.</br> | |||
<hovergallery> | |||
Image:| | |||
Image:| | |||
IMG_7007.jpeg|Faucet and tile installed | |||
Image:IMG_6868.jpeg|Craftroom cabinets installed | |||
Image:IMG_6508.jpg|Cabinets installed | |||
</hovergallery> | |||
=== Basement Data Center === | |||
See [[Camp_Kiwi_Data_Center|Data Center]] | |||
== Addition == | == Addition == | ||
We're building an addition onto the house as well as the remodel (below). Mostly we wanted some additional garage space, so we're mirroring the existing 3 car with an identical space - with my in-laws there are 4 driving adults in the house, plus lawn care equipment and workshop space. Because the existing garage has a small piece of house leading out to it, we also chose to miror this space, which will give us some additional living space we didn't really ''need'', but it doesn't hurt to have. In the basement it will be a storage space with a walk-out to the back yard and steps into the new garage. On the first floor it will be a workout/exercise room, and an additional guest bedroom/suite (with kitchenette). There will be storage over the garage as well. | |||
<hovergallery> | <hovergallery> | ||
Image:IMG_5558.jpg|Getting ready, the parking pad will go away, and parking will suck for quite awhile | |||
Image:IMG_5559.jpg|Topsoil stripped | |||
Image:IMG_5561.jpg|This old sewer line will be moved back about 10', into the setback | |||
Image:IMG_5570.jpg|The addition goes here | |||
Image:IMG_5591.jpg|New sewer crock | |||
Image:IMG_5594.jpg|The architect didn't get a real survey, with elevations, so I used my laser level to get a sense for how much the garage had to be raised to be even with the existing garage - 14" in front | |||
Image:IMG_5595.jpg|22" in the back | |||
Image:IMG_5614.jpg|Backfilling the sewer excavation-the foundation will cross over this... | |||
Image:IMG_5615.jpg|Excavating the basement | |||
Image:IMG_5637.jpg|Foundation drainage | |||
Image:IMG_5639.jpg|Connection to the existing basement | |||
Image:IMG_5645.jpg|Garage footer preparation | |||
Image:IMG_5646.jpg|Foundation forms | |||
Image:IMG_5648.jpg|Bridging the sewer excavation | |||
Image:IMG_5652.jpg | |||
Image:IMG_5654.jpg|The excavators nicked the existing driveway drainage... this will be rerouted around the foundation | |||
Image:IMG_5724.jpg|Foundation wall prep | |||
Image:IMG_5732.PNG|footer pour | |||
Image:IMG_5733.jpg | |||
Image:IMG_5743.jpg|Garage fill requirements now clear... | |||
Image:IMG_5744.jpg|A good foundation | |||
Image:IMG_5822.jpg|Annoying but inevitable construction yard damage | |||
Image:IMG_5826.jpg|Using a rock-slinger to fill the foundation | |||
Image:IMG_5829.jpg|Insulating the basement foundation | |||
Image:IMG_5830.jpg|The existing roof drains ran across the new garage, so openings were left in footer wall for this drain pipe to carry this to the adjacent creek | |||
Image:IMG_5831.jpg|Rerouting the driveway drainage and picking up the downspouts | |||
Image:IMG_5832.jpg | |||
Image:IMG_5833.jpg | |||
Image:IMG_5845.JPG|Insulating the garage footers | |||
Image:IMG_5848.jpg|Ready for the basement slab | |||
Image:IMG_5850.jpg | |||
Image:IMG_5851.jpg|This is the sewer drain for the garage, a direct connection. I'm not happy with this, but it works... strikes me as lazy on the part of my architect | |||
Image:IMG_5852.jpg|Downspout connections | |||
Image:IMG_5853.jpg | |||
Image:IMG_5854.jpg | |||
Image:IMG_5855.jpg | |||
Image:IMG_5856.jpg|Basement slab poured | |||
Image:IMG_5858.jpg|Ready for garage slab | |||
Image:IMG_5861.jpg | |||
Image:IMG_5862.jpg | |||
Image:IMG_5859.jpg | |||
Image:IMG_5863.jpg | |||
Image:IMG_5864.jpg | |||
Image:IMG_5865.jpg | |||
Image:IMG_5866.jpg | |||
Image:IMG_5867.jpg | |||
Image:IMG_5868.jpg | |||
Image:IMG_5875.jpg | |||
Image:IMG_5877.jpg | |||
Image:IMG_5878.jpg | |||
Image:IMG_7185.jpeg|Preparing the Basement Step forms | |||
Image:IMG_7199.jpeg|Basement walk-out steps | |||
Image:IMG_7187.jpeg|Basement utility room | |||
Image:IMG_7237.jpeg | |||
Image: | Image: | ||
Image: | Image: | ||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Addition Workout Room === | |||
The fitness room has several really nice big windows at the first-floor level, and will be filled with (mostly) exercise equipment we bought from the previous owners - including a Gold's Gym universal machine, a stair stepper, a treadmill, and elliptical trainer and some free weights. We also picked up a rowing maching/recumbant bike trainer. There will be two TVs on the wall that joins to the existing house, and a couple of fans. There are outlets in the floor for the machines and will be a yoga mat and ceiling mounted speakers. | |||
[[File:Workout.mov|Workout room video]] | |||
<hovergallery> | |||
Image:66138108495_6C653430-4BCF-4E07-AF19-050B2379DE95.jpg | |||
Image:IMG_7562.jpg|Installing ceiling fans | |||
Image:IMG_9041.jpg|Workout room door | |||
Image:IMG_9271.jpg|Workout room door | |||
Image:IMG_9279.jpg|Workout TVs | |||
Image:IMG_9285.jpg|Workout TVs | |||
Image:IMG_9293.jpg|Workout equipment | |||
Image:IMG_9294.jpg|Workout equipment | |||
Image:Workout.mov|Workout room video | |||
Image:IMG_9300.jpg|Workout Smith Machine | |||
Image:IMG_9301.jpg|Workout Smith Machine | |||
Image:IMG_9302.jpg|Workout equipment | |||
Image:IMG_8982.jpg|Mouldings installed | |||
Image:IMG_8520.jpg|Window trim | |||
Image:IMG_8602.jpg | |||
Image:IMG_8674.jpg | |||
Image:IMG_8740.jpg | |||
Image:IMG_6182.jpg|Addition from exercise room to storage over garage | |||
Image:IMG_6183.jpg|Addition workout room | |||
Image:IMG_6184.jpg|Addition workout room | |||
Image:IMG_6096.jpg|Pool end of workout room | |||
Image:IMG_6097.jpg|Pool end of workout room | |||
Image:IMG_7190.jpeg|Insulating the workout room | |||
Image:IMG_7228.jpeg|Drywalling steps up to exercise room from new garage entrance | |||
Image:IMG_7229.jpeg|Drywall in workout room - openings on upper wall are TV power and data, wood in left background is doorway to existing house | |||
Image:IMG_7235.jpeg|Drywall on the window side of workout room | |||
Image: | |||
</hovergallery> | |||
=== Addition Guest Suite === | |||
The guest suite is going to be the really nice bedroom on the second floor for our guests, although we already have 3 pretty nice bedrooms up there. This one will have a double-french-door "Juliet balcony" to the backyard, and walk-in closet and on-suite shower, and work desk, bed with fan and it's own thermostat for comfort, TV and kitchenette and apartment-sized laundry. The shower is getting the same tile as the rest of the addition, but cut down into miniature sizes. Looks pretty cool. It'll have a stone wall and glass surround, and the kitchenette will have stone countertops and blue cabinets, with a full oven, microwave, dishwasher, sink, refrigerator and washer/dryer set inside a cabinet.<br/> | |||
<hovergallery> | |||
Image:IMG_0624.jpg|Framing to install kitchette cabinets | |||
Image:IMG_0625.jpg|Temporary kitchen sink for permitting | |||
Image:IMG_0626.jpg|Railing for "Juliet" balcony - fresh air but no exterior space... | |||
Image:IMG_0628.jpg|Toilet almost ready, toilet bar/roll holder | |||
Image:IMG_0630.jpg|Temporary vanity counter - we'll upgrade this later, this is just to get the occupancy permt | |||
Image:IMG_0623.jpg|Fridge installed | |||
Image:IMG_0627.jpg|Cabinets built and ready to go in | |||
Image:IMG_0629.jpg|Shower coming along | |||
Image:IMG_9040.jpg|Door trimmed | |||
Image:IMG_8516.jpg|Bathroom flooring | |||
Image:IMG_8764.jpg|Kitchenette flooring | |||
Image:IMG_7311.jpeg|Bed area in drywall | |||
Image:IMG_7312.jpeg|Desk/TV area | |||
Image:IMG_8865.jpg|Flooring | |||
Image:IMG_8952.jpg|Windows trimmed and baseboard | |||
Image:IMG_8951.jpg | |||
Image:IMG_8953.jpg|Shower pan in progress | |||
Image:IMG_8986.jpg|Shower pan finished | |||
Image:IMG_7222.jpeg|Skylight in kitchenette | |||
Image:IMG_7223.jpeg|Drywall around the dryer vent | |||
Image:IMG_7224.jpeg|Vaulted ceiling over bed area | |||
Image:IMG_7226.jpeg|Drywall walk-in closet | |||
Image:2023_06_01 Guest Closet 1.jpg|Guest Master Closet system by closet maid, 16" with rail | |||
Image:2023_06_01 Guest Closet 2.jpg | |||
Image:2023_06_01 Guest Master 1.jpg|Master setup for summer guests | |||
Image:2023_06_01 Guest Master 2.jpg|(still a bit sparse, but ready!) | |||
</hovergallery> | |||
=== Addition Guest Suite Bath === | |||
Guest Bath. Note the custom tile floor, body sprays, rain head, glass surround, and bookmatched stone.<br/> | |||
<hovergallery> | |||
Image:2023_05_15 Guest Kitchen Cabinet 4.jpg | |||
Image:2023 05 12 Guest Bath Cabinet.jpg | |||
Image:2023 05 12 Guest Bath body wash.jpg | |||
Image:2023_06_01 Guest Bath 1.jpg | |||
Image:2023_06_01 Guest Bath 2.jpg | |||
Image:2023_06_01 Guest Shower 1.jpg | |||
Image:2023_06_01 Guest Shower 2.jpg | |||
Image:2023_06_01 Guest Shower 3.jpg | |||
Image:2023_06_01 Guest Shower 4.jpg | |||
Image:2023_06_01 Guest Shower 5.jpg | |||
Image:2023_06_01 Guest Shower 6.jpg | |||
Image:2023_06_01 Guest Shower 7.jpg | |||
Image:2023_06_01 Guest Shower 1.jpg | |||
Image:guest suite shower surround.jpg|shower surround | |||
Image:guest suite bath cabinet.jpg|Cabinet | |||
Image:guest suite sink 1.jpg|Sink and Mirrors | |||
Image:guest suite sink 2.jpg|Nearly done | |||
Image: | |||
</hovergallery> | |||
=== Addition Guest Suite Kitchenette === | |||
The entrance to the new guest suite has it's own kitchenette, which fridge, stove,a nd microwave.<br/> | |||
<hovergallery> | |||
Image:IMG_0786.jpg|Refridgerator | |||
Image:IMG_0787.jpg|Cabinets and washer/dryer hookups | |||
Image:IMG_0788.jpg|Stove/microwave side | |||
Image:2023_04 Suite Dishwasher Wall.jpg | |||
Image:2023_04 Suite Dishwasher.jpg|Dishwasher | |||
Image:2023_04 Suite Microwave Wall.jpg | |||
Image:2023_04 Suite Microwave.jpg|Microwave | |||
Image:2023_04 Suite Washer Dryer Cabinet 1.jpg|Washer and Dryer | |||
Image:2023_04 Suite Washer Dryer Cabinet 2.jpg|Washer and Dryer | |||
Image:2023_05_12 kitchenette backsplash.jpg|Backsplash | |||
Image:2023_05_15 Guest backsplash 2.jpg | |||
Image:2023_05_15 Guest backsplash 3.jpg | |||
Image:2023_05_15 Guest Kitchen Cabinet 1.jpg | |||
Image:2023_05_15 Guest Kitchen Cabinet 2.jpg | |||
Image:2023_05_15 Guest Kitchen Cabinet 3.jpg | |||
Image:2023_06_01 Guest Kitchen Cabinet 1.jpg|with Stove and sink, ready for family summer visit! | |||
Image:2023_06_01 Guest Kitchen Cabinet 2.jpg|with dishwasher and coffee maker | |||
Image:2023_06_01 Guest Kitchen Cabinet 3.jpg|cabinets in and solar power skylight shade with remote! | |||
Image:2023_06_01 Guest Kitchen Cabinet 4.jpg|Fridge is in, with glass doors (dry erasable!) | |||
Image:2023_06_01 Guest Kitchen Cabinet 5.jpg|Washer dryer in cabinets (full sized) | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Addition Garage === | |||
The new garage is finally starting to come along, so I'll flesh this out a bit. Since there's 4 of us, all driving adults, we wanted at least 4 parking spots, and I need a place for my lawn tractor and yard tools and a work bench. We opted to build a mirror image of the existing garage to keep everything looking symetrical, which also meant building a bit of house since the existing garage connects to the main house with a hallway with some minor rooms.<br/> | |||
The roof is a little unique. It's a pretty standard black shingle on the back, mostly because there will be so much covered by solar panels. The front is a pretty grey plastic dimensional shingle ([https://www.davinciroofscapes.com/ DaVinci]) that mimics slate, and is supposed to last 50 years.</br> | |||
My workshop will have a work bench and ceiling-mounted sound system and a sink. You can see I installed a monitor with an Apple TV so I can watch shows or checkthe security cameras, and the door has been matched to the grid-in-glass door on the garage (this replaces the blue steel door in some of the older pictures that we needed for the inspection).<br/> | |||
The garage is getting [https://racedeck.com/ RaceDeck™] garage tiles (12"x12") in a grey-on-grey checkerboard pattern. I wanted something to snaz it up a bit, and we'd tried epoxy in a previous house. That was OK, but was prone to getting really dirty, where these can replaced if a few get bad, and hot tires can pull epoxy off of the floor. Also these were a little cheaper than paint. Unfortunately we wanted to do the open "Free Flow" tiles under the cars (for snow and rain to drain and not make the floor slippery) and solid "Coin" tiles everywhere else, but once we got the 1,000 tiles (250 of each style) our tile guy found that the FreeFlow were slightly (~1/8") bigger, and after about 2 rows would no longer interlock!!! Fortunately RaceDeck™ and our retailer ([https://www.garageflooringllc.com/ideas/ Colorado Garage Flooring]) agreed to cover shipping the uncut coin tiles back and replacing them with Free Flow.<br/> | |||
Some finishing touches. I installed doorbells on our garage door and back door (in case you get locked out while in the hot tub!). This will let our guests ring our door only downstairs, and the Szoke's guests to ring the front door (and only ring them!).<br/> | |||
<hovergallery> | |||
Image:IMG_0964.jpg|Garage interior and shop door | |||
Image:IMG_0965.jpg|Garage exterior door | |||
Image:IMG_0939.jpg|Garage TV/monitor | |||
Image:66147156974_62AB2C1D-0E8D-47DD-8B17-FD0A779EB7B2.jpg|Shelving | |||
Image:IMG_7652.jpg|Faux copper gutters | |||
Image:IMG_9283.jpg|Gutters | |||
Image:IMG_9284.jpg|Gutters | |||
Image:IMG_9286.jpg|Gutters | |||
Image:IMG_9289.jpg|Downspouts | |||
Image:IMG_9290.jpg|Gutters and downspouts | |||
Image:IMG_9295.jpg|Gutters | |||
Image:IMG_9296.jpg|Gutters | |||
Image:IMG_9297.jpg|Gutters | |||
Image:IMG_8992.jpg|Grading for the parking mat | |||
Image:IMG_8993.jpg|Rocks for parking mat | |||
Image:IMG_8994.jpg|Workshop cabinets | |||
Image:IMG_9081.jpg|Workshop countertop | |||
Image:IMG_9133.jpg|Workshop sink | |||
Image:IMG_8958.jpg|Final grading | |||
Image:IMG_8959.jpg | |||
Image:IMG_8960.jpg | |||
Image:IMG_8961.jpg | |||
Image:IMG_8962.jpg | |||
Image:IMG_8963.jpg | |||
Image:IMG_8483.jpg | |||
Image:IMG_8484.jpg | |||
Image:IMG_8504.jpg | |||
Image:IMG_8543.jpg|Workshop | |||
Image:IMG_8544.jpg|Getting ready for storage and workshop racks | |||
Image: | |||
Image: | |||
Image:IMG_8316.jpg|Elizabeth and my doorbell - on the new garage | |||
Image:IMG_8320.jpg|Networking in the workshop | |||
Image:misalign.jpg|Cumulative misalignment | |||
Image:IMG_8279.jpg|First few rows setup with Coin tiles in between the doors | |||
Image:IMG_8280.jpg|The door/car parking area is all open/Free Flow tiles | |||
Image:IMG_8284.jpg|Setting up the layout | |||
Image:IMG_8285.jpg|One bay looking good | |||
Image:IMG_8286.jpg|Snazzy car charging area! | |||
Image:IMG_8309.jpg|Tiles ready to go back | |||
Image:IMG_8327.jpg|Reay to install new FreeFlow on Bay 3 | |||
Image:IMG_8888-charger.jpg|Porsche charger for Elizabeth's Cayenne | |||
Image:IMG_8889-charger.jpg | |||
Image:IMG_8948.jpg|Final grading behind garage/addition | |||
Image:IMG_8955.jpg | |||
Image:IMG_8954.jpg | |||
Image:IMG_8956.jpg | |||
Image:IMG_8957.jpg | |||
Image:IMG_8958.jpg | |||
Image:IMG_8959.jpg | |||
Image:IMG_8960.jpg | |||
Image:IMG_8961.jpg | |||
Image:IMG_8962.jpg | |||
Image:IMG_8963.jpg | |||
Image: | |||
Image: | |||
Image: | |||
Image:IMG_7310.jpeg|Completed garage roof with faux copper windown flashing | |||
Image:IMG_7313.jpeg|Garage roof | |||
Image:IMG_7317.jpeg|Garage/courtyard sound | |||
Image:IMG_7161.jpeg|Garage roof finished | |||
Image:IMG_7160.jpeg|Garage roof finished | |||
Image:IMG_7149.jpeg|Garage roof in progress | |||
Image:IMG_7148.jpeg|Garage roof in progress | |||
Image:IMG_7069.jpeg|Garage roof in progress | |||
Image:IMG_7053.jpeg|Garage roof in progress | |||
Image:IMG_7032.jpeg|Garage roof in progress | |||
Image:IMG 6819.jpeg|Brickwork mid-wall | |||
Image:IMG_6799.jpg|New garage doors, and trim finally painted | |||
Image:IMG_6800.jpg|Brickwork coming along quite nice | |||
Image:IMG_7336.jpeg|In drywall, with split HVAC unit | |||
Image:IMG_7337.jpeg|In drywall | |||
Image:IMG_7338.jpeg|Drywall | |||
Image:IMG_7339.jpeg | |||
Image:IMG_6089.jpg|addition sheathed | |||
Image:IMG_6090.jpg|addition sheathed | |||
Image:IMG_6092.jpg|Congress Ave end of new garage | |||
Image:IMG_6093.jpg|Congress Ave end of new garage | |||
Image:IMG_6094.jpg|Rear of new garage | |||
Image:IMG_6095.jpg|Rear of new garage | |||
Image:IMG_7188.jpeg|Finishing insulation | |||
Image:IMG_7234.jpeg|My workshop | |||
Image:IMG_7221.jpeg|Outside shop on way to basement | |||
Image:IMG_7232.jpeg|From workout room up to bathroom and attic storage | |||
Image:IMG_7233.jpeg|Door to garage from courtyard | |||
Image:garage2_electric_panel.jpg|Sub-panel for snow melt pad | |||
</hovergallery> | |||
=== Addition Basement Storage / Elizabeth's Office === | |||
We decided to make this an office for Elizabeth late in the process. It's probably bigger than it needs to be, but it is what it is.<br/> | |||
<hovergallery> | |||
Image:IMG_9092.jpg|Stairs to garage | |||
Image:IMG_9093.jpg|Stairs to garage | |||
Image:IMG_9282.jpg|Office desk | |||
Image:IMG_7327.jpeg|Drywalled | |||
Image:IMG_7328.jpeg|Drywalled | |||
Image:IMG_7329.jpeg|Hall to main house basement | |||
Image:IMG_7340.jpeg|Staircase from basement to garage/exercise room | |||
Image:IMG_7319.jpeg|Utility room | |||
Image:IMG_7325.jpeg|Utility room | |||
Image:IMG_7326.jpeg|Utility room | |||
Image:IMG_8566.jpg|Utiliy storage | |||
Image:IMG_6343.jpg|16 Basement Storage | |||
Image:IMG_6098.jpg|New walkout to hot tub | |||
</hovergallery> | |||
=== Addition Attic Storage / Au Pair Suite === | |||
Over the new garage we created a storage area, but it has an attached bath/shower in case we want to make it a bedroom for a caretaker/au-pair (and it's fitted with it's own HVAC zone, CO and smoke detectors).<br/> | |||
<hovergallery> | |||
Image:IMG_8983.jpg|Trim at landing/shower | |||
Image:IMG_8984.jpg|Window trim/casing | |||
Image:IMG_8985.jpg|Stair finishing/sanding | |||
Image:IMG_8986.jpg|Shower pan | |||
Image:IMG_8990.jpg|Shower pan | |||
Image:IMG_9042.jpg|Stair finishing/sanding | |||
Image:IMG_9097.jpg|Shower glass/door | |||
Image:IMG_9098.jpg|Shower cubby | |||
Image:.jpg| | |||
Image:.jpg| | |||
Image:.jpg| | |||
Image:IMG_6185.jpg|Addition | |||
Image:IMG_6186.jpg|Addition | |||
Image:IMG_6187.jpg|Addition | |||
Image:IMG_6190.jpg|Addition | |||
Image:IMG_6191.jpg|Addition | |||
Image:IMG_6192.jpg|Addition | |||
Image:IMG_6193.jpg|Addition | |||
Image:IMG_6194.jpg|Addition | |||
Image:IMG_8983.jpg|Trim | |||
Image:IMG_8984.jpg|Trim | |||
Image:IMG_8985.jpg|Steps | |||
Image: | |||
Image:Sorage Tile.jpg|Tiling storage area | |||
Image:IMG_6091.jpg|looking into new basement storage area | |||
Image:IMG_7193.jpeg|Insulating the roof over attic storage-spray foam doesn't require attic venting and makes it really quiet | |||
Image:IMG_7195.jpeg|Close up of spray foam | |||
Image:IMG_7212.jpeg|Drywalling the attic storage | |||
Image: | |||
Image:IMG_8565.jpg|Storage over the garage | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== HVAC === | |||
Our new HVAC system has steam humidification and UV lamps for virus destruction.</br> | |||
<hovergallery> | |||
Image:IMG_6458.jpg|Exercise room | |||
Image:IMG_6461.jpg|Foyer/Stairs | |||
Image:IMG_6462.jpg|Foyer/Stairs | |||
Image:IMG_6463.jpg|Storage Area | |||
Image:IMG_6464.jpg|Storage Area | |||
Image: UV light1.jpg|Reme UV Lamp for Virus protection | |||
Image: UV light2.jpg | |||
Image:Humidifier Cannister 1.jpg|Replacement steam canister Honeywell HM750ACYL | |||
Image:Humidifier Cannister 2.jpg|Steam cannister | |||
</hovergallery> | |||
=== Plumbing === | |||
<hovergallery> | |||
Image:IMG_6459.jpg|Drain from guest suite bath | |||
Image:IMG_6460.jpg|Drain from guest suite bath | |||
</hovergallery> | </hovergallery> | ||
== Basement | == Energy and Energy Efficiency == | ||
=== Geothermal Installation === | |||
In 2017 there was still a 30% Federal tax credit for residential geothermal installations, and since we bought a big house with HVAC units right at the edge of their life expectancy my (accountant) wife talked me into replacing everything with geo. Geothermal startup was in March 2019. | |||
We opted for the Climate Master Trilogy (Heat/AC/Hot Water) systems, a pair of 4 ton units, and a 3 ton split system for the upstairs - that's because there was no good way to get the geo piping up there, so we installed the heat exchanger/heat pump downstairs and reused the line set for the old AC system to take geo cooled refridgerant upstairs to a more traditional space pack, which has gas back-up heat. | |||
We chose Gallagher/Hauser HVAC to do our installation, as the local company with the most experience. Their work has been technically quite good, but their customer service (for us) has been abysmal from start-to-finish, with scope creepy, cost overruns, and schedule delays at every turn so I would not recommend to anyone. For the kind of money we spent with them it's shocking how little regard they gave even the simplest requests. | |||
The geothermal installation was really interesting to watch. First Jackson drilling showed up and installed 8 wells, each 300' deep. Each well provides 2 tons of heating/cooling capacity, through it's 600' of 1" PVC tubing, and there were two well fields installed in a line below our driveway to provide 8 tons each. The wells are 20' apart to allow them enough ground to extract heat from. The tubing was premade with a 'U' shaped connection at the tip. I think the holes are 3" in diameter, and the tubing is encased in Benseal (a bentonite mixture for casing the well) for heat dispersal. They liked drilling at our house because the asphalt made the process really clean for them, they could easily rack the tailing from the drill away and they had a nice solid base for thier rig, and since we have mostly shale and sandstone they were going through a 20' section of drilling pipe about every 2 minutes, or a well about every half hour. They made quite a mess, but the drilling was done in a couple of days. Or, rather, it would've been if they didn't break the bit on the next to last hole - and they didn't have a spare on this rig.<br/><br/> | |||
<embedvideo service="youtube">https://www.youtube.com/watch?v=4KM_ra9MKYw</embedvideo> | |||
'''Drilling''' | |||
<hovergallery> | |||
Image:IMG_5119.jpg|1" PVC tubing | |||
Image:IMG_5120.jpg | |||
Image:IMG_5146.jpg|Setting up the drilling rig | |||
Image:IMG_5156.jpg|The drilling started around my birthday and made quite a mess... I didn't like that, so Elizabeth got me a cake to ease the blow | |||
Image:IMG_5158.jpg | |||
Image:IMG_5123.jpg|The front wall by shower where the well field will enter the house | |||
Image:IMG_5121.jpg|Tubing will route through here | |||
Image:P1050158.jpg|Drilling | |||
Image:P1050159.jpg | |||
Image:P1050160.jpg | |||
Image:P1050161.jpg | |||
Image:P1050162.jpg | |||
Image:P1050163.jpg | |||
Image:P1050164.jpg|Sweeping the tailings away | |||
Image:P1050165.jpg | |||
Image:P1050166.jpg | |||
Image:P1050167.jpg|Tubing installed | |||
Image:P1050168.jpg | |||
Image:P1050169.jpg|Adjacent wells | |||
Image:P1050170.jpg|Bentonite has been pumped in | |||
Image:P1050171.jpg|The white tube was used to feed bentonite | |||
Image:P1050172.jpg|The last well on this field - this one is next to the gas line (but we didnt' know it)! | |||
Image:P1050173.jpg|They typically use this pan for tailings, but didn't need to here | |||
Image:P1050174.jpg | |||
Image:P1050175.jpg | |||
Image:P1050176.jpg|U bend at tip of tubing | |||
Image:P1050177.jpg | |||
Image:P1050178.jpg|610' of tubing per well (in a 'U') | |||
Image:P1050179.jpg|The business end | |||
Image:P1050180.jpg | |||
Image:P1050181.jpg | |||
Image:P1050183.jpg | |||
Image:P1050184.jpg | |||
Image:P1050186.jpg | |||
Image:P1050187.jpg | |||
Image:P1050188.jpg | |||
Image:P1050189.jpg | |||
Image:P1050190.jpg | |||
Image:P1050191.jpg | |||
Image:P1050192.jpg|Starting the second field | |||
Image:P1050193.jpg | |||
Image:P1050194.jpg | |||
Image:P1050195.jpg | |||
Image:P1050196.jpg | |||
Image:P1050197.jpg | |||
Image:P1050198.jpg|Benseal Bentonite | |||
Image:P1050199.jpg | |||
Image:P1050200.jpg | |||
Image:P1050203.jpg | |||
Image:P1050210.jpg|Benseal Bentonite | |||
Image: | |||
Image: | |||
</hovergallery> | |||
These were connected via a trench about 3' deep (pretty close to the frost line here in Cincinnati) manifold system so the could equalize the flow to each well in parallel and bring the cooling fluid (a mixture of glycol) into the house. The soutern field's last well was drilled without a boot's width of an unknown (and thus not marked by the utiltiy protection folks) of our neighbors gas line - which the ripped out while trenching. One field runs to the south end of the house into the front utility space and provides 3 tons of cooling for the front of the house through a Trilogy 45 unit service the the front of the basement and first floor, and a 4 ton split unit that feeds cooled fluid to a standand line set to the otherwise conventional HVAC unit for the second floor. The front Trilogy has cooling dampers and thermostats for the following zones.<br/> | |||
* Basement Office | |||
* First Floor Dining Room<br/> | |||
The northern well field comes into the house in the full bath and routes up the wall and into the ceiling to reach the rear utility space where there is a 4 ton Trilogy 45 system for the back of the house - basement and first floor. In the ceiling is a T for the 3 ton HVAC unit for the addition. 1 Ton of excess capacity was planned. The rear Trilogy has cooling dampers and thermostats for the following zones.<br/> | |||
* Basement Master Bedroom | |||
* Basement Family Room | |||
* First Floor Master Bedroom | |||
* First Floor Family Room<br/> | |||
'''Well Fields''' | |||
<hovergallery> | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image:P1050215.jpg|The southern trench | |||
Image:P1050217.jpg | |||
Image:IMG_5178.jpg|Wells complete and trenching | |||
Image:P1050218.jpg|The northern trench | |||
Image:P1050219.jpg | |||
Image:P1050220.jpg | |||
Image:P1050221.jpg | |||
Image:P1050222.jpg | |||
Image:P1050223.jpg | |||
Image:P1050224.jpg | |||
Image:P1050231.jpg | |||
Image:IMG_5166.jpg|Connecting the wells into a field | |||
Image:P1050233.jpg | |||
Image:P1050235.jpg | |||
Image:P1050236.jpg | |||
Image:P1050237.jpg | |||
Image:P1050238.jpg|Pressure testing the tubing | |||
Image:P1050239.jpg | |||
Image:P1050240.jpg | |||
Image:P1050241.jpg | |||
Image:P1050243.jpg | |||
</hovergallery> | |||
Each of the 2 Trilogy units gets added efficiency by using some of the excess heat from the heat pump and well system to heat hot water for the house as well. This makes it the most efficient unit you can get in the United States. We will use this hot water as preheat to a system of tankless (Navien) hot water heaters that can provide endless full-flow hot water, and the electric backup heat in the Trilogy tanks will be deactivated. | |||
'''Heat Pump Installation''' | |||
<hovergallery> | |||
Image:IMG_5179.jpg|Geo piping brought into the house for HVAC installation | |||
Image:IMG_5177.jpg|4 ton Trilogy 45 | |||
Image:IMG_5180.jpg|Trilogy connections for hot water and geo fluid | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
</hovergallery> | |||
=== Solar Power Arrays === | |||
We've installed (with [https://www.iconsolar.com/ ICON Solar]) to get about 31.61kW (max continuous) of solar arrays on the south side (back) of the existing garage (the bulk) and west (back) side of the house to generate electric. Ohio is not a peak power state, so there isn't much need for batteries most of the time, and they're pretty expensive. We do get a decent tax incentive for installing them. The system came online on 28 April, 2021.</br> | |||
The arrays will start going in right after the roof is replaced. The system will consist of 125 (was 109) Canadian Solar MaxPower ([https://www.solaris-shop.com/canadian-solar-maxpower-cs6x-325p-325w-poly-solar-panel/ CS6X-325P]) 325W panels.</br> | |||
UPDATE: The roof is on, and ICON came in and installed the solar panels over 3 days. I have to say they look pretty good. Here are some pictures, and a quick YouTube of the shingles and solar array (the house is still a mess, but it was a nice sunny day, so I figured why not?). As part of the installation of the new geothermal heat pumps, generator and solar array we determined (with Bryan Bowden, electrical engineer) that we needed to upgrade our service from Duke. After a couple of fits and starts it was determined that the "code" load would be just under 800A capacity, but since we'd started with a lower number orginally we opted to install 1,000A just to be sure. As part of that Duke put in a new transformer for us, on a new pole, but they wanted a new vault at the base as well, which was a lot of work. [[https://www.linkedin.com/in/dan-keller-79567228 Keller]] did a great job on the install.<br/> | |||
<hovergallery> | <hovergallery> | ||
Image: | Image:IMG_4028.jpg|Solar online and generating | ||
Image:Power Panel.jpg|Power Panel for Solar and Generator | |||
Image:CS6X-325P 46058.1477589342.1280.1280.png|325W Solar Panel | |||
Image:IMG_8198.jpg|New "CT" Cabinet coming in from transformer | |||
Image:IMG_8199.jpg|New electric meter (upgraded to 1,000A 'Net Metering' so we can feed the grid | |||
Image:IMG_8200.jpg|Generator auto-transfer switching | |||
Image:IMG_8201.jpg|I think this is the new "CT" cabinet... | |||
Image:IMG_8473.jpg|Coming off of the roof | |||
Image:IMG_8472.jpg|This is the infeed for the solar array... | |||
Image:IMG_8471.jpg|And the shutoff switch where it connects to the grid-side of the generator's auto transfer switch | |||
Image:IMG_8008.jpg|Generac 1,000A auto transfer switch | |||
Image:IMG_8009.jpg|Generac 1,000A auto transfer switch | |||
Image:IMG_8010.jpg|Generac 1,000A auto transfer switch | |||
Image:IMG_8013.jpg | |||
Image:IMG_8014.jpg | |||
Image:IMG_8043.jpg|Installing the new vault | |||
Image:IMG_8044.jpg | |||
Image:IMG_8016.jpg|Solar cells over master bathroom | |||
Image:IMG_8017.jpg|Solar cells over upstairs hallway | |||
Image:IMG_8018.jpg|Solar cells on existing garage | |||
Image:IMG_8019.jpg|SSolar cells over kitchen | |||
Image:IMG_8021.jpg|JLG lift to install | |||
Image:IMG_8023.jpg|DaVinci sample | |||
Image:IMG 8024.jpg|Inside of bus cabinet | |||
Image:IMG_8025.jpg | |||
Image:P1070335.jpg | |||
Image:P1070336.jpg | |||
Image:P1070337.jpg | |||
Image:P1070338.jpg | |||
Image:P1070339.jpg | |||
Image:P1070340.jpg | |||
Image:P1070341.jpg | |||
Image:P1070342.jpg | |||
Image:P1070343.jpg | |||
Image:P1070344.jpg | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | |||
Image: | Image: | ||
</hovergallery> | </hovergallery> | ||
== | [[File:ICON system Specs.pdf|thumb]] | ||
<embedvideo service="youtube">https://www.youtube.com/watch?v=94S6H759jkY</embedvideo> | |||
=== Backup Power Generator === | |||
We've installed (as of April 23, 2021) a Generac QT150 generator from [https://www.riverside-elec.com/ Riverside Electric] for whole-house electric backup. It's a natural gas powered 10 cylinder generator. This unit feeds 450 amps (120VAC) to the house at full load and will burn 2,061 cuft of gas an hour (2 million BTU/HR @ 100%) when running, and is a 150 kW/hr rated generator, [https://www.generac.com/industrial/products/gaseous-generators/standard/commercial-series-150kw-gaseous-generator Generac Commercial Series Model QT150] (Liquid Cooled). It runs a self-test every Wednesday at noon (same time as the warning sirens to minimize noise complaints).</br> | |||
It is installed in the backyard at grade next to, but below the pool equipment and tie into it's existing gas line. We also were required to upgrade our gas service so that the pool heater and generator could run at the same time (full-load). The high pressure system needed a foundation, so we had to pour that, and lower the pool heater so the line running to the generator could run above grade.</br> | |||
<hovergallery> | <hovergallery> | ||
Image:IMG_8508.jpg | |||
Image:IMG_8509.jpg | |||
Image:IMG_8954.jpg | |||
Image:IMG_8955.jpg | |||
Image:IMG_8959.jpg|grading around upgraded gas service | |||
Image:IMG_8960.jpg | |||
Image:IMG_8125.jpg|The connection at the street for our gas line had to be upgraded | |||
Image:IMG_8126.jpg | |||
Image:IMG_8294.jpg|The generator needed this flexible hose for vibration | |||
Image:protector-c2-gas-left.png|Generac Protector Series Model RG0060 (Liquid Cooled) whole-home backup/standby generator | |||
Image:IMG_8192.PNG|Delivery Day | |||
Image:back yard right generator delivery.mp4 | |||
Image:front door generator delivery.mp4 | |||
Image:garage generator delivery.mp4 | |||
Image: | Image: | ||
Image:CS6X-325P 46058.1477589342.1280.1280.png|325W Solar Panel | |||
Image:IMG_8198.jpg|New "CT" Cabinet coming in from transformer | |||
Image:IMG_8199.jpg|New electric meter (upgraded to 1,000A 'Net Metering' so we can feed the grid | |||
Image:IMG_8200.jpg|Generator auto-transfer switching | |||
Image:IMG_8201.jpg|I think this is the infeed for the solar array... | |||
Image:IMG_8193.jpg | |||
Image:IMG_8195.jpg | |||
Image:High Pressure Gas 1.jpg|High pressure gas foundation | |||
Image:High Pressure Gas 3.jpg|Regulator feeds the house, the pool line bypasses at high pressure | |||
Image:High Pressure Gas 4.jpg|Installed high pressure gas system | |||
Image:High Pressure Gas 5.jpg|Finished high pressure gas | |||
Image:High Pressure Gas 6.jpg|Pool heater getting ready to go back in | |||
Image:High Pressure Gas 2.jpg|Pool heater foundation (lowered) | |||
Image:High Pressure Gas 7.jpg | |||
Image:High Pressure Gas 8.jpg | |||
Image:High Pressure Gas 9.jpg | |||
Image:High Pressure Gas 10.jpg | |||
Image:High Pressure Gas 11.jpg | |||
Image:Gas_job_done.jpg|A job well done | |||
Image:generac-home-backup-generators-qt-series-70kw-80kw-100kw-130kw-150kw_spec-sheet.pdf|We got the 100kW unit | |||
</hovergallery> | |||
== Jake's Room == | |||
We moved my nephew in to go to college, and so we setup the bonus room over the garage with his own workspace, TV and gaming area, and fridge and microwave.<br/> | |||
<hovergallery> | |||
Image:Jake_1.jpg | |||
Image:Jake_2.jpg | |||
Image:Jake_3.jpg | |||
Image:Jake_4.jpg | |||
Image:Jake_5.jpg | |||
Image:Jake_6.jpg | |||
Image:Jake_7.jpg | |||
Image: | Image: | ||
</hovergallery> | |||
== Data Center == | |||
See [[Camp_Kiwi_Data_Center|Camp Kiwi Data Center]]. | |||
== Other Updates == | |||
=== "Kittys Room" === | |||
There as a dog room in the house when we bought. I don't have a dog. But, we could use a second powder room for guests on the first floor, and a place to put a cat box. So, we put in a piece of frosted glass in the "doggie window" (so they could see the front door), installed a fan, toilet, and upgraded the sink. They'd also installed a Dutch Door so they could keep the dogs in, and the motion sensor in this hall was set to be inactive when Away so the dog's wouldn't trip it (nor their caretakers coming in the side door).</br> | |||
<hovergallery> | |||
Image:IMG_7169.jpeg|Finished counter | |||
Image:IMG_7170.jpeg|Sink and Mirror | |||
Image:IMG_7171.jpeg|New toilet | |||
Image:IMG_7168.jpeg|Fogged window pane | |||
Image:IMG_5539.jpg|Cabinets going in | |||
Image:IMGA0001.JPG|"Doggie Window" with glass | |||
</hovergallery> | |||
=== Tree Removal === | |||
We needed a few trees removed. First, there was a rotting tree leaning dangerously in the backyard, a dead ash in the front yard, and 2 pine trees behind the existing garage that were going to block the solar array.</br> | |||
<hovergallery> | |||
Image:IMG_7060.jpeg|Pine trees | |||
Image:IMG_7061.jpeg|Pine trees | |||
Image:IMG_7062.jpeg|Pine trees | |||
Image:IMG_7057.jpeg|Pine trees | |||
Image:IMG_7056.jpeg|Pine trees | |||
Image:IMG_7052.jpeg|Pine trees | |||
Image:IMG_7054.jpeg|Pine trees | |||
Image:IMG_7055.jpeg|Disposing of branches | |||
Image:IMG_7058.jpeg|Rotted tree in back yard | |||
Image:IMG_7059.jpeg|Rotted tree in back yard | |||
Image:| | |||
Image:| | |||
Image:| | |||
</hovergallery> | |||
=== Fire Pit === | |||
Before the big "COVID-19" panic of 2020, we'd visited some airplane friends in Pennsylvania. They had one of these [https://breeo.co/ Breeo smokeless firepits], and Elizabeth liked it so well we got one.</br> | |||
<hovergallery> | |||
Image:IMG_3347.jpeg|New firepit | |||
Image:IMG_15157.jpeg| | |||
Image:IMG_6973.jpeg| | |||
Image:| | |||
Image:| | |||
</hovergallery> | |||
=== Pool Heater Replacement === | |||
Our old pool heater gave out, so we got a new one. This one has an optional phone "smart interface".</br> | |||
<hovergallery> | |||
Image:IMG_6215.jpg|New pool heater | |||
</hovergallery> | </hovergallery> | ||
Latest revision as of 18:13, 7 September 2024
We purchased our new home after Christmas 2017 (closing was 12/27/2017) and started an ambitious remodel, completely gutting the basement to add a second master space and create a Data Center. The basement remodel got it's Final inspection on 04/28/2020 (we moved down from upstairs in November of 2019). The addition received it's Final inspection for occupancy on 01/26/2023, though we were using it well before that. We also elected to covert it to 100% geothermal heating and air-conditioning and install tankless hot water (to supplement the "free" geothermal hot water). Geothermal is dedicated to the geothermal installation process and results.
Pictures to Process
Just uploading these for now, I need to add the background later.
- X.jpg
x
Driveway
The house came with a decent asphalt driveway back in 2017. We tore it up building the addition and burying the geothermal wells and piping under it, as well as just running construction equipment over it for 3 years. And, I seriously dislike it. Concrete is King. Long live the King. Anyway, we're preparing to install the new driveway, with a largish parking area, an electric rolling gate with mail drop and package drop and camera/entry keypad and lights. It should be pretty pimp, though it is going to be terribly expensive...
Update: April 2023, construction actually started, pictures below. It will be 5" thick with rebar, and the parking pad (4 or so cars) next to the addition, which will have in-slab heating for melting snow that I'll plow here from the courtyard (with sub-surface drainage). The plan is also to have an electrically-operated car gate in front of the courtyard, so we're adding a truck turnaround and large mail/package delivery and dispensing unit for the letter-carrier and UPS/FedEx. There will be a video doorbell at the gate so we can let people in, and car detector to open the gate to let folks out, as well as car detectors on either side of the driveway to notify us when someone is coming down the driveway. "All the modern conveniences" as they say. The honeysuckle on both sides of the drive is being removed, as well as the landscaping between us and the neighbor's driveways, but we will probably put something back at the end. Also, our southern neighbor has a fence and light post on our property, in the driveway easement, that isn't mentioned in that easement, so we're going to remove that. Some of that is controversial, so we've retained counsel just in case it gets bothersome.
Here is a picture of the southern property line. As you can see, we actually own the land under about 1/2 of their driveway. Their easement on our plot allows them to "access their property, and maintain the current driveway". It is silent on any other feature, which means we retain all other rights. Incidentally, we had to point out this nuance at a Village planning meeting on x as they are also making improvements. They're building a new 3 car garage as well, and a sun room on the opposite end of their house, and had planned a expanded driveway on our property. We shared our survey to indicate that this was, in fact, our property, and that code does not allow building closer than 5' of the property line. During their construction, they've placed their potta-potty and ruble pile on our property (in the easement) at the same time as our ruble is on the opposite easement, so I'm sure that our northern neighbor is not enjoying the view these days.
The concrete guys cut the water supply to the fountain and the sprinklers, so we need to reconnect this. We had them bury conduit to house these, and mark them where they exit the new slab. You can we went with rebar rather than chicken wire, and this is held off the ground with plastic "chairs", and is drilled-through the end boards to keep it centered in the slab. They're pouring large - about 30' x 30' sections, at a time and then saw-cutting as they move forward. They also found the incoming fiber for our internet and cut it. The ISP was out the next day to string a new line overhead, and we'll bury a conduit under the driveway at the low-point trench drain so they can run from the pole, under the drive, and around the house to the ONT. The fountain circle is now centered on the house, leaving just under 30' clearance on both sides, but is not quite centered on the front door (it's off center) or either garage (our doors are 10', whereas the old garage has 9' doors - which makes our new garage slightly longer as well).
Finishing
Easements, Plans, and Survey
Courtyard
Left Side
Right Side
Blemishes
Property Line/Survey Documentation
Here is some documentation of the property line from the survey we had done.
On the North side (925) in the back the property line is just outside of the old wire fencing, outside of the white fencing and beyond the new gas installation and well outside of the chain link fencing in the back corner. There is an old abandoned well or sewer access behind the chainlink fence.
Across the back the property line is just outside of the chainlink fence. There is a momument at the Trelawny back corner, and on the tennis/dog run corner.
On the Trewlany (915/935) side (South), the property is just inside the split rail fence where the tennis court used to be, but we own the dog run, and the side yard runs just inside the split rail fence.
Across the front, there is a momument just outside the fence on the 925/915 corner, and the property runs just outside the fence to a monument just beyond the garage near the driveway.
Mo' Neighbors, Mo' Problems
Lights
Driveway lights are AspectLED 3W 12V 2 hole lamps (AL-IG-PW-A2S-DW-12VDC-2FT DayWhite 6000K) with sleeves (Mounting Sleeve for Pathway Light AL-IG-A21) powered by 100W supply (100 Watt LED Power Supply AL-PS-W-100-12).
Basement Remodel
We bought this house to get closer to the city, but still have some property and privacy, and to move my in-laws in. They don't need help now, but they might someday, and my wife wanted to be able to spend some quality time with them as they enjoy their retirement. We wanted to get them single-floor living, so if they do end up needing surgeries or have any mobility issues it won't be that hard, but we didn't want to give up having our own very nice space either.
This house provided that opportunity, it's large enough, and although it has a sunken family room and a couple steps to get into, is pretty flat with a first floor master, kitchen, laundry, and office for them. It also sits well up, so the spacious basement is only about 3' under grade, and so we were able to put in lots of windows and build a complete second master bedroom, bath, closet, full office, kitchen, and family room in the basement, in addition to a billiards room (it came with a table) and the data center.
It has 3 bedrooms upstairs for guests, and with the geothermal heating and air system we were able to zone it with 7 independent zones of heating an air so everyone can be comfortable (and we have tankless hot water for unlimited showering and laundry). When done it will really be extremely nice. One of the nice features of this home is every floor has a long, straight central hallway with stairs at both ends. This does make it hard to locate people, though, as it's big and they might be using the other stairwell.
A nice feature that I worked into the basement remodel is sound throughout. Our last house had built-in speakers, and I really liked it. I'd paired those (driven by simple stand-alone amplifiers) to Apple Airport Express units so I could "Airplay" music to them. Around the time we moved I got interested in the Sonos Connect:Amp product as an integrated amplifier and connected-device in one unit. I picked up a few for the first floor and really liked those, so I bought a bunch (7) more for the basement and threw them into the data center, one for each major room (although the master bedroom and closet share a unit/zone). I wanted to keep the power and data infrastructure in the rack, with UPS (battery backup) and the Tivos, etc. so I mounted local volume controls in each room and ran the main speaker wire back to the data center. This is nice because although you can control the overall volume from the Sonos app, and easily group and ungroup the Amps into multiple independent areas and individually or collectively control the volume, sometimes when you're actually in the room it seems too loud. The Sonos allows a lot of different music sources, Apple Music, Amazon, Plex, your iTunes library, TuneIn, and Line in. I'm using one Line In from an Airport Express to enable Airplay, which the original Sonos do not support, and I had another big idea. My older Apple TV (the new ones did away with it) and Tivos all have Digital Audio Output. I ran Toslink/SPDIF cable from each TV location to the data center, and picked up some digital-to-analog converters for the data center and connected the analog side to the individual Sonos amps, and now I can output my TV sound to the built-in speakers! Too cool, and great for Superbowl parties and the like.
Another idea this enabled is the "TV behind a 2-way mirror" trick! I built in a TV mount behind my vanity mirror and placed electric, network, and digital audio inside the space, and an IR receiver/retransmitter into the mirror mount so I could turn the TV on and off, and now I can watch TV through the mirror and get the sound on the in-ceiling speakers!
Basement Master Bedroom
Our master bedroom is about 17'x18' with french doors opening to the rear stairway next to the "extra" shower and basement entrance to the addition. The addtion has a walkout set of french doors that gives us easy access to the hot tub. We enlarged the window area to three 3'x5' windows for natural light, which open to the side yard at grade behind the addition overlooking the wooded creek, so it's pretty private. The master has it's own zone of HVAC, a security panel, and connects to a small hallway between the master bath and closet thorugh a pocket door so I can get up and get ready for work without distrubing Elizabeth. It has 9' ceilings iwth a fan, and the same brushed, exterior-grade Italian marble that the basement has thorughout.
The electrical outlets above the windows are for HomeKit remote controlled/powered blinds or shades that will open and close automatically based on time of day, day of the week, and weather (or difference between indoor and outdoor temperature and sunniness).
Basement Master Closet
The master closet is about 18'x18' with an additional pocket of about 9'x4' where our stacking washer and dryer will go. It has sound, just like every other room in the basement, and the walls are covered with IKEA storage cabinets with white glass doors with soft-close sliders and automatic lighting that comes on when the door is opened. This will provide tons of hanging storage as well as a bunch of shelving, and a (not yet pictured/installed) island will house our sundries (socks and undies) and give us a place to lay your wallet and keys down while changing, and it will have a bench on either end to sit on while you put your shoes and socks on. I really, really like everything to be tidy, and these cabinets are a nice compromise since Elizabeth doesn't ahve to put everything away every single day for it to appear tidy.
The closet, like most of the rooms in the basement has HomeKit WiFi controllable, and dimmable lighting switches in the wall, so that with dimmable LED bulbs mounted I can achieve nearly any lighting level. My idea is to have a motion sensor in the connector hallway (which has it's own lighting circuit) that will turn on the lights in the master bathroom and closet at a low (15% mabye) level when I get up so I can safely reach them, but dim enough not to disturb anyone until I can get the pocket door closed behind me. Then I can raise the light level to whatever level I want.
In the rear wall are shut-off valves for the water going to the pool cabana. We had them piped to the drain in the utility room while we were building, so we can just open the access panel and drain the cabana each fall directly to the sewer. Around the corner from the main set of cabinets is a nook for a full size stackable washer/dryer.
Basement Master Bathroom
The master bathroom is about 15'x15', with a 9'x5' glass surround shower as the main feature, and a double vanity. Behind the mirror on my side of the vanity is a TV, with the sound wiring I mentioned above so I can listen to the morning new on the built in speakers from my Tivo or watch AppleTV. These both have RF remotes, but I have a IR repeater for the TV on/off function. The toilet is next to the shower, and as I mentioned we installed 2 of the largest tankless water heaters to make sure we can run both sets of rainheads and body-sprays without running out of hot water. The shower surround is marble countertop material, so it's way thicker than it needs to be, and we decided to cover the entire wall since the glass will give the room a seamless look.
Note that the floor has zero transition, but gently slopes to the back wall where the shower heads are. The glass surround will have a center door, and you can just see that there is a trench drain about 6" wide with a removable stone inlay, with about 1/4" drain slit all the way around, 4' wide for each shower head. Similarly the ceiling is gently sloped towards the back wall (since the entire space is enclosed) to keep moisure from forming on the tile overhead and dripping on us. Instead it will gently flow towards the drains as well. The glass will be treated with a special anti-spotting coating. Also note that we have installed "real" grab-bars in the shower and at all the toilets in the basement. For one, it's nice to have something to grab onto, and for two I hate seeing tile broken by a soap dish that's been pulled away. And since we installed all 3' doors in the basement, it's technical ADA compliant should it ever need to be. And it'll be nice the next time one of us wrenches a back. :-)
The door to the hallway will probably never really get used as the bath also has a door out the back to the pantry, and from there to the kitchen which is what I'm sure we'll use the majority of the time. Also note the center cabinet that will hide Elizabeth hair dryer, spin toothbrush, and curling iron, etc., with outlets inside. It cleverly lifts up for access, again to get things tidy.
Basement Kitchen
The kitchen gets the same stone Versailles pattern as the rest of the basement. It's way more kitchen than we really need, but in a million dollar home, you kind of need to do certain finish levels. The kitchen is about 18'x18' with another 15'x5' or so for our dining room table. It has a large island in the middle with a overhanging bar area for stools with the sink and diswasher built-in. The opposite wall will have a fancy Wolf gas range, and stainless fridge and microwave with full-height stone backsplash. The vent required for such a large range was problematic and required additional make-up air provisions I don't even want to think about.
All of the cabinets are internally lighted with drawer lights that come on when opened, a feature we really liked in our old house's IKEA cabinets. The upper cabinets have downlighting as well as hidden outlets so that there are no vible openings in the stone. The same is true on the island were the outlets are mounted on the sides in the cabinets, and all of the drawers are soft-close. We got all Wolf/Cove/Sub-Zero (it's one company) appliances, except the main fridge. There's a mini fridge in the bar for pool or TV drinks, and the dishwasher has LED lights inside and WiFi, as well as a light system that shows if the load is done because it's so quiet. A red dot on the floor means it's running, green means done (see below).
The "Dining Room" is just a little slice of the kitchen and family room stolen for the table, but it's more than we really need, especially with the stools on the edge of the kitchen island. On the long (rear of house) end of the kitchen/dining space is a wall of cabinets, the uppers of which are non-functional - they hide a HVAC duct and soffit, but the lowers are also lighted and have more adjustable pantry shelving. There is a door between the kitchen and the coffee bar/pantry that is decorated/hidden as a cabinet door.
Basement Pantry
The pantry is only about 8'x8', as we don't really cook much we don't need a ton of storage. But we do need a few staples, and Elizabeth piped water from the bathroom wall to where our countertop will go for her professional Keurig coffee maker. Each upper cabinet is getting under-cabinet lighting.
The walls get the same subway tile as the powder room, and the one wall will get a kitty-sized door to the utility room where the litty box will be kept. The outer side of the pantry door (in the kitchen) will get cabinet doors so it blends into the cabinetry in there.
Basement Office
The basement office is my room. It's got the same fan as the master, and 2 big escape-sized windows. The window well has egress stairs, and with the closets and smoke detector make it a legal bedroom. I'll make one of the closets standard and the other will have a bunch of extra shelves for my computer stuff. The two big windows open onto the driveway and fountain, which is nice, and bring in a bunch of light. Since we didn't want to waste that light we installed 12 light glass french doors onto the hallway.
I'll have my wrap-around computer desk setup with dual monitors on my main iMac and antoher workstation for Elizabeth's MacBook or either of our work laptops. The room is wired with dual 10G copper and dual 10G fiber to the data center. Also the side wall is wired for a TV, and I plan to put my futon opposite for naps or for catching a game while I work on something. Also, since my security cameras are available on AppleTV, every one of these TVs duals as a security monitor.
Basement Family Room
The family room is 25'x20', and has a foyer and bar next to a walkout to the back yard pool area. We ran electric in the slab to where the couch will sit (it's an electric recliner, and for phone chargers or laptops, etc.), and mounted a TV mount, and added a built-in gas fireplace.
The big french doors on our side of the hallway (our master suite with walk-in closet, bath, pantry, kitchen, family room, dining room, bar and walk-out the pool are all on the west side of the house's main hallway so we can close it off) can all be held open with these cool magnetic latches with built-in spring-dampener systems so they gently grab and hold the door if you open it a little too briskly. Very cool.
Basement Bar
The bar was a tiny little mini-kitchen (without any cooktop but a fridge) when we bought the place. It wasn't big enough for our needs, so we repuposed it into a bar with a mini-fridge under counter for pool drinks mostly. I don't need a bar, but it was there...
Much like the kitchen, the backwall is one large piece of stone with no opens for power outlets. Here the base of the cabinet hides the outlets and the glass-front cabinets are lighted.
Basement Billiards Room
The billiards room is 20'x15'. I didn't need a billiards room, but we got the table "free" when we bought the house, and everybody else wanted to keep it.
Basement Powder Room
The basement powder room is just a small toilet and vanity across from the family room, with a pocket door. It's next to the "Craft room" which is very small now, and is really just a hallway to the data center.
Basement Hallway
...it's a hallway...
Basement Shower
The extra shower and bathrooom is a nice feature. It already existed, so we thought there was no other really good use for the space, so we kept it and just made it a little smaller, giving what used to be the vanity to the hallway to the addition. It's about 8'x8' with a standup shower with subway tile and a glass surround, a toilet and small vanity.
Basement Craft Room
The craft room really doesn't have much left over after the Data Center and Powder room were broken off, but still has some cabinets and sink.
Basement Data Center
See Data Center
Addition
We're building an addition onto the house as well as the remodel (below). Mostly we wanted some additional garage space, so we're mirroring the existing 3 car with an identical space - with my in-laws there are 4 driving adults in the house, plus lawn care equipment and workshop space. Because the existing garage has a small piece of house leading out to it, we also chose to miror this space, which will give us some additional living space we didn't really need, but it doesn't hurt to have. In the basement it will be a storage space with a walk-out to the back yard and steps into the new garage. On the first floor it will be a workout/exercise room, and an additional guest bedroom/suite (with kitchenette). There will be storage over the garage as well.
Addition Workout Room
The fitness room has several really nice big windows at the first-floor level, and will be filled with (mostly) exercise equipment we bought from the previous owners - including a Gold's Gym universal machine, a stair stepper, a treadmill, and elliptical trainer and some free weights. We also picked up a rowing maching/recumbant bike trainer. There will be two TVs on the wall that joins to the existing house, and a couple of fans. There are outlets in the floor for the machines and will be a yoga mat and ceiling mounted speakers.
Workout room video
Addition Guest Suite
The guest suite is going to be the really nice bedroom on the second floor for our guests, although we already have 3 pretty nice bedrooms up there. This one will have a double-french-door "Juliet balcony" to the backyard, and walk-in closet and on-suite shower, and work desk, bed with fan and it's own thermostat for comfort, TV and kitchenette and apartment-sized laundry. The shower is getting the same tile as the rest of the addition, but cut down into miniature sizes. Looks pretty cool. It'll have a stone wall and glass surround, and the kitchenette will have stone countertops and blue cabinets, with a full oven, microwave, dishwasher, sink, refrigerator and washer/dryer set inside a cabinet.
Addition Guest Suite Bath
Guest Bath. Note the custom tile floor, body sprays, rain head, glass surround, and bookmatched stone.
Addition Guest Suite Kitchenette
The entrance to the new guest suite has it's own kitchenette, which fridge, stove,a nd microwave.
Addition Garage
The new garage is finally starting to come along, so I'll flesh this out a bit. Since there's 4 of us, all driving adults, we wanted at least 4 parking spots, and I need a place for my lawn tractor and yard tools and a work bench. We opted to build a mirror image of the existing garage to keep everything looking symetrical, which also meant building a bit of house since the existing garage connects to the main house with a hallway with some minor rooms.
The roof is a little unique. It's a pretty standard black shingle on the back, mostly because there will be so much covered by solar panels. The front is a pretty grey plastic dimensional shingle (DaVinci) that mimics slate, and is supposed to last 50 years.
My workshop will have a work bench and ceiling-mounted sound system and a sink. You can see I installed a monitor with an Apple TV so I can watch shows or checkthe security cameras, and the door has been matched to the grid-in-glass door on the garage (this replaces the blue steel door in some of the older pictures that we needed for the inspection).
The garage is getting RaceDeck™ garage tiles (12"x12") in a grey-on-grey checkerboard pattern. I wanted something to snaz it up a bit, and we'd tried epoxy in a previous house. That was OK, but was prone to getting really dirty, where these can replaced if a few get bad, and hot tires can pull epoxy off of the floor. Also these were a little cheaper than paint. Unfortunately we wanted to do the open "Free Flow" tiles under the cars (for snow and rain to drain and not make the floor slippery) and solid "Coin" tiles everywhere else, but once we got the 1,000 tiles (250 of each style) our tile guy found that the FreeFlow were slightly (~1/8") bigger, and after about 2 rows would no longer interlock!!! Fortunately RaceDeck™ and our retailer (Colorado Garage Flooring) agreed to cover shipping the uncut coin tiles back and replacing them with Free Flow.
Some finishing touches. I installed doorbells on our garage door and back door (in case you get locked out while in the hot tub!). This will let our guests ring our door only downstairs, and the Szoke's guests to ring the front door (and only ring them!).
Addition Basement Storage / Elizabeth's Office
We decided to make this an office for Elizabeth late in the process. It's probably bigger than it needs to be, but it is what it is.
Addition Attic Storage / Au Pair Suite
Over the new garage we created a storage area, but it has an attached bath/shower in case we want to make it a bedroom for a caretaker/au-pair (and it's fitted with it's own HVAC zone, CO and smoke detectors).
- .jpg
- .jpg
- .jpg
HVAC
Our new HVAC system has steam humidification and UV lamps for virus destruction.
Plumbing
Energy and Energy Efficiency
Geothermal Installation
In 2017 there was still a 30% Federal tax credit for residential geothermal installations, and since we bought a big house with HVAC units right at the edge of their life expectancy my (accountant) wife talked me into replacing everything with geo. Geothermal startup was in March 2019.
We opted for the Climate Master Trilogy (Heat/AC/Hot Water) systems, a pair of 4 ton units, and a 3 ton split system for the upstairs - that's because there was no good way to get the geo piping up there, so we installed the heat exchanger/heat pump downstairs and reused the line set for the old AC system to take geo cooled refridgerant upstairs to a more traditional space pack, which has gas back-up heat.
We chose Gallagher/Hauser HVAC to do our installation, as the local company with the most experience. Their work has been technically quite good, but their customer service (for us) has been abysmal from start-to-finish, with scope creepy, cost overruns, and schedule delays at every turn so I would not recommend to anyone. For the kind of money we spent with them it's shocking how little regard they gave even the simplest requests.
The geothermal installation was really interesting to watch. First Jackson drilling showed up and installed 8 wells, each 300' deep. Each well provides 2 tons of heating/cooling capacity, through it's 600' of 1" PVC tubing, and there were two well fields installed in a line below our driveway to provide 8 tons each. The wells are 20' apart to allow them enough ground to extract heat from. The tubing was premade with a 'U' shaped connection at the tip. I think the holes are 3" in diameter, and the tubing is encased in Benseal (a bentonite mixture for casing the well) for heat dispersal. They liked drilling at our house because the asphalt made the process really clean for them, they could easily rack the tailing from the drill away and they had a nice solid base for thier rig, and since we have mostly shale and sandstone they were going through a 20' section of drilling pipe about every 2 minutes, or a well about every half hour. They made quite a mess, but the drilling was done in a couple of days. Or, rather, it would've been if they didn't break the bit on the next to last hole - and they didn't have a spare on this rig.
Drilling
These were connected via a trench about 3' deep (pretty close to the frost line here in Cincinnati) manifold system so the could equalize the flow to each well in parallel and bring the cooling fluid (a mixture of glycol) into the house. The soutern field's last well was drilled without a boot's width of an unknown (and thus not marked by the utiltiy protection folks) of our neighbors gas line - which the ripped out while trenching. One field runs to the south end of the house into the front utility space and provides 3 tons of cooling for the front of the house through a Trilogy 45 unit service the the front of the basement and first floor, and a 4 ton split unit that feeds cooled fluid to a standand line set to the otherwise conventional HVAC unit for the second floor. The front Trilogy has cooling dampers and thermostats for the following zones.
- Basement Office
- First Floor Dining Room
The northern well field comes into the house in the full bath and routes up the wall and into the ceiling to reach the rear utility space where there is a 4 ton Trilogy 45 system for the back of the house - basement and first floor. In the ceiling is a T for the 3 ton HVAC unit for the addition. 1 Ton of excess capacity was planned. The rear Trilogy has cooling dampers and thermostats for the following zones.
- Basement Master Bedroom
- Basement Family Room
- First Floor Master Bedroom
- First Floor Family Room
Well Fields
Each of the 2 Trilogy units gets added efficiency by using some of the excess heat from the heat pump and well system to heat hot water for the house as well. This makes it the most efficient unit you can get in the United States. We will use this hot water as preheat to a system of tankless (Navien) hot water heaters that can provide endless full-flow hot water, and the electric backup heat in the Trilogy tanks will be deactivated.
Heat Pump Installation
Solar Power Arrays
We've installed (with ICON Solar) to get about 31.61kW (max continuous) of solar arrays on the south side (back) of the existing garage (the bulk) and west (back) side of the house to generate electric. Ohio is not a peak power state, so there isn't much need for batteries most of the time, and they're pretty expensive. We do get a decent tax incentive for installing them. The system came online on 28 April, 2021.
The arrays will start going in right after the roof is replaced. The system will consist of 125 (was 109) Canadian Solar MaxPower (CS6X-325P) 325W panels.
UPDATE: The roof is on, and ICON came in and installed the solar panels over 3 days. I have to say they look pretty good. Here are some pictures, and a quick YouTube of the shingles and solar array (the house is still a mess, but it was a nice sunny day, so I figured why not?). As part of the installation of the new geothermal heat pumps, generator and solar array we determined (with Bryan Bowden, electrical engineer) that we needed to upgrade our service from Duke. After a couple of fits and starts it was determined that the "code" load would be just under 800A capacity, but since we'd started with a lower number orginally we opted to install 1,000A just to be sure. As part of that Duke put in a new transformer for us, on a new pole, but they wanted a new vault at the base as well, which was a lot of work. [Keller] did a great job on the install.
Backup Power Generator
We've installed (as of April 23, 2021) a Generac QT150 generator from Riverside Electric for whole-house electric backup. It's a natural gas powered 10 cylinder generator. This unit feeds 450 amps (120VAC) to the house at full load and will burn 2,061 cuft of gas an hour (2 million BTU/HR @ 100%) when running, and is a 150 kW/hr rated generator, Generac Commercial Series Model QT150 (Liquid Cooled). It runs a self-test every Wednesday at noon (same time as the warning sirens to minimize noise complaints).
It is installed in the backyard at grade next to, but below the pool equipment and tie into it's existing gas line. We also were required to upgrade our gas service so that the pool heater and generator could run at the same time (full-load). The high pressure system needed a foundation, so we had to pour that, and lower the pool heater so the line running to the generator could run above grade.
Jake's Room
We moved my nephew in to go to college, and so we setup the bonus room over the garage with his own workspace, TV and gaming area, and fridge and microwave.
Data Center
Other Updates
"Kittys Room"
There as a dog room in the house when we bought. I don't have a dog. But, we could use a second powder room for guests on the first floor, and a place to put a cat box. So, we put in a piece of frosted glass in the "doggie window" (so they could see the front door), installed a fan, toilet, and upgraded the sink. They'd also installed a Dutch Door so they could keep the dogs in, and the motion sensor in this hall was set to be inactive when Away so the dog's wouldn't trip it (nor their caretakers coming in the side door).
Tree Removal
We needed a few trees removed. First, there was a rotting tree leaning dangerously in the backyard, a dead ash in the front yard, and 2 pine trees behind the existing garage that were going to block the solar array.
Fire Pit
Before the big "COVID-19" panic of 2020, we'd visited some airplane friends in Pennsylvania. They had one of these Breeo smokeless firepits, and Elizabeth liked it so well we got one.
Pool Heater Replacement
Our old pool heater gave out, so we got a new one. This one has an optional phone "smart interface".